My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/20/2002 PLANNING BOARD Minutes
>
03/20/2002 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 3:34:31 PM
Creation date
1/25/2022 2:42:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
03/20/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Donald L. Haes, Jr., Ph.D., CHP <br /> Radiation Safety Specialist <br /> Voice: 603 883-6129 Fax: 603-883-6134 Email:haes@tems.com <br /> April 19, 2002 <br /> Permitting Boards <br /> Mashpee,MA <br /> Re: RF field measurements in the general vicinity of the proposed 150 foot monopole to be <br /> located at 90-100 Echo Road in Mashpee,MA by Seacoast,LP. <br /> PURPOSE <br /> I have reviewed the information pertinent to the proposed installation at the above location. <br /> In order to determine compliance ("Guidelines for DRI Review of Wireless Communications <br /> Towers"' published by the Cape Cod Commission},broadband measurements have been obtained <br /> at locations in the general vicinity of the proposed 150 foot monopole. The physical conditions are <br /> that the following personal wireless services antennas would be mounted on the monopole:Verizon <br /> Wireless and AT&T Wireless. The measured values of power density are presented as a percent of <br /> current Maximum Permissible Exposures [%MPE] as adopted by the Federal Communications <br /> Commission [FCC] Z-', and those established by the Massachusetts Department of Public Health <br /> [MDPH] ° (With 100% signifying an acceptable amount). <br /> SUMMARY <br /> Broadband measurements of existing ambient RF fields in the general vicinity of the <br /> proposed site indicate the peak(maximum) field to be about 0.15%of the regulatory limits for RF <br /> exposure to members of the public. These RF field measurements are accurate, and meet FCC and <br /> MDPH guidelines. <br /> RF field theoretical calculations were performed by this consultant as issued in a report dated <br /> April 11, 2002. The results indicated a maximum potential increase of about 0.11 % of the <br /> maximum allowable (%MPE). The sum of existing and proposed theoretical RF fields would be <br /> significantly below FCC and MDPH RF exposure limits; that is,less than 0.3 percent. This means <br /> there could be over 300 additional similar installations, and still be below all regulatory limits for <br /> RF exposure. <br /> Based on my extensive experience with personal wireless services facilities,and the RF fields <br /> I have calculated and measured, it is my expert opinion that the current and proposed personal <br /> wireless services installations would comply with regulatory guidelines for RF exposure. <br /> 427 Amherst Street,Unit#11 <br /> Nashua,NH 03063 <br />
The URL can be used to link to this page
Your browser does not support the video tag.