Laserfiche WebLink
i <br /> Permit require identification of all significant trees on a <br /> plan, which has not yet been provided. <br /> Mr. Bornstein stated he is making an attempt to save <br /> more than the "significant trees" . Until such time as the <br /> land is cleared and building loations. ae been identified <br /> it is extremely difficult to provide landscaping details . <br /> He offered a plan for each- individual building a-s it i <br /> being constructed. <br /> The chairman explained the Board required landscaping <br /> details just as the roads and buildings have been indicated <br /> on a plan. <br /> The Town Planner -suggested Applicant submit a draft <br /> plan now and a final plan as ea-ch building is completed. <br /> Torn Quinn noted they are allowed to clear 20-feet <br /> around each building. It is not always necessary to clear <br /> all the way around a building, in which case the trees <br /> could remain closer to the building. If allowed to provide <br /> individual landscaping plans for each of the buildings, <br /> Applicant could thereafter provide information of those <br /> areas being left in a natural state (as requested by some <br /> buyers) . Every effort is being made to allow for the <br /> preservation of existing trees. <br /> The chairman expressed concern with notbeing provided <br /> a draft landscape plan of the project. <br /> The Town Planner suggested a draft plan be submitted; <br /> as each individual building permit is requested, a more <br /> detailed landscape plan be provided. He volunteered to <br /> provide the appropriate language; a waiver to the special <br /> Permit regulation. <br /> He reminded the Board of the decision as to whether or <br /> not to allow the road clearing. <br /> Don Myers suggested ppli -ant provide Just a much <br /> detail as possible on any draft landscaping plans being <br /> submitted regarding significant effects of said <br /> landscaping. <br /> Tory Quinn requested permission to cut the road, which <br /> would provide the -opportunity to tag all trees over lo- <br /> inches back to where the proposed buildings will be <br /> 7 <br />