My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/22/1998 PLANNING BOARD Minutes
>
04/22/1998 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 5:03:17 PM
Creation date
1/27/2022 1:56:13 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
04/22/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> s <br /> Covenant Release yt <br /> No charge if road system completed and satisfactory report ort filed of final <br /> a <br /> construction inspection. :5J <br /> $75 per request if release involves posting of other security incomplete lete roads. <br /> p <br /> Permit Modifications <br /> �o <br /> Filing fees for subdivision or special permit modifications shall be the same as <br /> listed above for an original application. {_ <br /> Review fees and inspection fees shall be the same as listed above for an original f. <br /> application, but based only on that portion of a project which is proposed to be <br /> modified, except that there will be no minimum fee. <br /> Re-inspection fees shall be the same as listed above for an original application. <br /> 14) <br /> In addition to the above fees, the applicant will be responsible for the cost of postage <br /> for mailing of required notices to abutters. <br /> Normal inspections covered by the basic inspection fees listed above include <br /> drainage inspection, gravel inspection, inspection of paving binder course, inspection of +_ <br /> paving finish course and final inspection for roadways in subdivisions and for roadways <br /> and parking areas in special permit projects other than cluster subdivisions, as well as <br /> other site development, exclusive of buildings, as required by the Planning Board, for <br /> special permit projects. d <br /> r <br /> A re-inspection fee will be charged for additional inspections beyond those fisted 1. !'S# <br /> above that are made necessary due to unsatisfactory materials or construction that lead kIt .4 <br /> to a failure to ass the original ins inspection. <br /> "} <br /> pp <br /> of .� <br /> The filing and review fees specified above shall be submitted to the Board-as part of <br /> the original application for any permit. An application will be deemed to be incomplete <br /> without payment of said fees at the time of submittal. , <br /> Inspection fees specified above shall be submitted to the board within 20 calendar �} <br /> days following the approval of any special permit and 1 or definitive subdivision plan and # <br /> prior to the Board's endorsement of any subdivision plan or special permit decision. <br /> Any re-inspection fees due shall be submitted prior to the release of any roadway <br /> covenant or performance bond for road construction or other facilities covered by a & ; <br /> subdivision or special permit approval. <br /> � k. <br /> h, <br /> ■1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.