Laserfiche WebLink
k <br /> The Chairman asked Mr. Rowley i f he had y seems the site. �. , <br /> Rowley stated it had been his understanding when speaking with <br /> �• Eagan that Ya�e would d advise P g <br /> ad i se W. Rowley as to whether or net <br /> the grass was up and the bounds had been set,. <br /> Mr. Eagan responded by stating yes, the grass is up and <br /> looks very <br /> good. The bounds� ds however, have not b�'.e17 set. <br /> The Chairman acknowledged receipt of Letter of Certification <br /> received from Chris Costa Associates "furnish and set twelve . <br /> (12) road contour monuments, cost $1,250, 00, Atlastic Hi hwa si n, Chr�stzne Larxe si n �33. 00" . g y <br /> g g for The Chairman noted the <br /> grass is up, but no one has seen 'It. <br /> �a� <br /> John Kuchinski asked if the wayhad been constructed �a'�t�M� <br /> cted to the <br /> cul-de-sac, to which Mr. Eagan answered, "Yes" . when Mr. � <br /> Kuchinski asked if it had been paved, Mr, Rowleyresponded b � <br /> stating, "The Last P y time Y saw i t, was when they were getting <br /> f 'or paving; I haven' t n � <br /> prepared p g, avers t seen it since" . Mr. Kuchinski 0 <br /> determined a report from Mr. Rowley in this regard would be F � <br /> required. <br /> There seemed to have been some element of misunderstanding, `' °;it <br /> Mr. Rowley stated that because he had not been notified, he did <br /> not make an inspection. There had also been misunderstanding on <br /> Mr. Ea c.I7' s art as he was <br /> g' , , under the impression Mr. Rowley was : <br /> to have received instructions to make an inspection. "' <br /> Mr. Kuchinski suggested this matter be continued for two- <br /> weeks. The Chairman explained that at that point, approval for � <br /> the release of covenant could be made, provided an inspection of <br /> the property is � satisfaction P <br /> p P y made t o Mr.. Rowl ey s approval. and <br /> and provided a check posting Applicant's choice of security worth - �u <br /> one hundred and fifty (15 o w) percent of the cost of completion, <br /> in addition Rowley ,�. <br /> to any requirements Mr, may deem necessary, <br /> `'�� <br /> Mr. Rowley agreed to go out to the site during the caning �..: . <br /> week and get in touch with the Town Planner after havingdone so. <br /> , Rowley <br /> Mr, <br /> �1 `'ey also requested a signed bill from Cris Costa & <br /> Associates w I1 <br /> The Board agreed to schedule this matter on the July 15, <br /> 1998 agenda. (This matter concluded at 7:50 p.m. ) <br /> Release of covenant ' <br /> .� r <br /> Mark Dedecko Kevin Kirrane-Ashers Heights Subdivision <br /> lop <br /> Release of Covenant on 3-Lots on Drew Lame , <br /> 40 <br /> The Chairman called this matter to order and determine <br /> d <br /> there was no one present to represent this matter, The Town ;l{� <br /> PlannerP� <br /> reported that at one point there was one cul-de--sac .f <br /> Within the subdivision that had been intentionally l of t 't, <br /> unfinished in anticipation of extending the road and purchasing <br /> -1 <br /> d' <br /> ' Ilk <br /> flow <br /> is•., <br /> .r. <br />