My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/01/1998 PLANNING BOARD Minutes
>
07/01/1998 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2022 5:08:33 PM
Creation date
1/28/2022 9:22:45 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
07/01/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10 <br /> resigned by the Planning Board this date, 'f�I a <br /> i;,.. <br /> The Town Planner further explained the owner was Mr. s <br /> Hostetter, the Applicant was Mr. Jonas. Mr. Fudala indicated the <br /> left hand corner of the Plan, explaining Mr. Jonas 'is the owner <br /> of the land to the south, and has created Lot 4--D as a means to <br /> access his property S � <br /> The chairman entertained a motion be made regarding the <br /> resignature of the ANR Plan as requested by Mr. Jonas-, <br /> WTIQN Dennis Ba.l.zarin i made a Motion to resign the ANR . <br /> Plan, as requested of the Board by Mr. Richardson Jonas, in order +, <br /> to record. the Plan at the Registry of Deeds; which Motion was <br /> seconded by Jahn Kuchinski and so voted unanimously, <br /> The Chairman resigned and dated four (4) copies of the ANR <br /> Plan. (This matter concluded at 6: 55 p.m. ) <br /> +{. <br /> special Permit-Ron Bonvie-Southport retirement corrnunit <br /> 1 <br /> Review status of revegetation and Phase II approval . <br /> The Chairman called this matter to order and recognized .� WL <br /> cbert o0 oni, who requested a continuance to sometime in the <br /> fall, regarding the issue of revegetat ion. <br /> Mr, Bonvi a stated he would present new landscaping plans to ''"F <br /> the Board at that time. Be commented that the weather has been, <br /> uncooperative with their planting efforts, the result of which <br /> has been unsuccessful � <br /> The chairman clarified that Applicant is seeking approval of *. <br /> the revegetation issue, not Phase II, but a coordination of the <br /> two at this point. Mr• Bonvi a agreed, stating Phase II is <br /> contingent upon the revegetation <br /> MOTION: John Kuchinski made a Motion to continue this ��� <br /> Special Permit matter toSeptember 1 F , . <br /> , �9 8. with an extension + <br /> date of September 4, 1 9 9 8; which. Motion was seconded. by Dennis ,,.. <br /> Bad.zarini and so voted unanimously. �;,i�J.4 <br /> 1 <br /> Mr. Bonvie requested the Board's approval for input <br /> regarding the inspection process from Mr. Rowley regarding ,,. <br /> inspections, roadway inspections, and raising of castings, He ,law <br /> stated there are no <br /> pavement issues at this time. •.. <br /> The Chairman deferred to Mr. Rowley, who stated the. first +'r <br /> thing he would require would be an inspection ion of the current <br /> status <br /> �` p s� <br /> of the prof ect, and that he would have to review the <br /> inspections he had made previously. Be stated it should. be <br /> considered a plan review in terms of the information/data he iii�+ of <br /> has, and also a site inspection would be required to determine <br /> h condition of the project completed to date. (W. Rowley and <br /> „ i <br /> y <br /> ��': ;,i. <br />
The URL can be used to link to this page
Your browser does not support the video tag.