My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/19/1998 PLANNING BOARD Minutes
>
08/19/1998 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2022 5:10:08 PM
Creation date
1/28/2022 9:41:07 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
08/19/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'I <br /> Attorney McElhinney stated the public access is noted within <br /> the Board of Appeals Decision, as well as on the ANR Subdivision <br /> Plan-Bryants Cove Road. Attorney McElhinney assured the Board <br /> that BryAnts Cove Road will be maintained and that the Willowbend � <br /> section of Simons Narrows Road will continue to be passable. <br /> P � ■ , <br /> Attorney McElhinney made reference to open space parcels <br /> shown on the Plan which are to be preserved. (There was some <br /> .I <br /> discussion regarding the dock. Attorney McElhinney stated it <br /> was not part of the Willowbend purchase. ) <br /> At this point the Town Planner mentioned two violations, one <br /> of which has been repaired. The Special Permit rewires. <br /> willowbend to maintain the crossings on g Qulnaqui set- the other is <br /> located at the northern end of Simons Narrows Road where the <br /> road has been obliterated as it originally existed. He suggested <br /> the Board review this situation during the site visit in order to <br /> determine whether or not it conforms with the Conditions. <br /> .r <br /> The Board Members agreed to conduct a site visit Saturday, , <br /> August 22, 1998, at 8: 00 a.m. <br /> Mr. Rowley asked if the Board would require him to make an <br /> inspection of the access road. The Chairman responded that he � 'i <br /> must see the road at some point in order to make the required <br /> construction inspection. Mr. Rowley requested a road profile be ,.�^, <br /> provided for him. which- Attorney McElhinney agreed to. <br /> The Town Planner stated he will not be in attendance for the <br /> September 199 8 Meeting. He suggested re-drafting - <br /> P ■ g gg ■ the Planning <br /> Board Decision to include those changes agreed to this evening, <br /> as well as making the following changes within the text. Page 1r 'TM � <br /> first sentence in last paragraph should read. " . . .the original # <br /> submittal and the changes to the area. . . 't and in the last <br /> sentence, . . .Team Engineering showing permitted design flow. . . " <br /> Mr. Rowley asked if the Board would be looking for a review �t .. <br /> of the Plan as well as an inspection of construction. The Board <br /> agreed they would like to have the Plan review. <br /> Covenant Release-Willowbend Development P ment Corporation <br /> ,l:x <br /> Phase II (The Glen) - Release of Covenant on 27-Lots <br /> d <br /> tt <br /> 1 <br /> The Chairman called this matter to order. Attorney <br /> McElhinney stated it to be a release for the Phase II lots. ., { <br /> Upon inspection made by Mr. Rowley and with permission of the !' <br /> Board, the bonding has been reduced to Four Hundred Two Thousand <br /> ($402. 0 0 0 . 0 0) Dollars, but the Release had never been finalized. -� <br /> The passbook account indicates a balance of Four Hundred Twenty <br /> Seven Thousand ($42 7, 0 0 0 . 0 0) Dollars. <br /> Attorney McElhinney stated applicant has submitted a _ <br /> Modificationwhich states <br /> of Agreement to the Town <br /> -9- <br /> � f <br /> '2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.