Laserfiche WebLink
The chairman inquired as to the status of this matter. The �. <br /> Town Planner responded these two (2) Lots 60 and 77' are the lots <br /> most recently created. <br /> It was determined the Covenant Releases have not yet been <br /> received. By way of review, the Chairman stated the majority of ' <br /> the lots had been released at the August 5, 1998 Meeting, under <br /> the old configuration. it <br /> John Kuchinski recalled. Attorney Karri.ne was to present the <br /> Release for Lots 6 7A and. 6 8A which are he new lots s in the <br /> � <br /> Rel � t �. � <br /> modified subdivision) , and Bond in the amount of Two Hundred ;4 ' <br /> Twenty Thousand ($22 o, o 0 0 . o 0) Dollars, prior to Releases being ,'&:. <br /> signed. <br /> Public Hearing-Willowbend Development Corporation <br /> Between the Heights and Shoestring Bay Estates <br /> Special Permit Modification #18 <br /> The Chairman called the matter of.- Construction of ems. <br /> road connection between Willowbend and Shoestring Bay Estates, <br /> expansion of water, sewer service to Shoestring Bay Estates. <br /> P � g y <br /> ISr ' <br /> He then recognized Attorney McElh.inney, who presented a more <br /> detailed Plan entitled "Willowbend Phase I Extension - Earth <br /> Tech" . Attorney McElhinney explained the request is for an <br /> access and utility connection between the existing Shoestring Bay 04 <br /> Subdivision and Phase III of Wi l l owbend Heights. JU- <br /> I I I <br /> Attorne McElhinney further stated the intent is to <br /> incorporate this change into the overall scheme of the Wi 1 l owbend . <br /> project, ie: lots would be sold with golf memberships i M 1 , <br /> approved. He stated there was a strong sentiment from the <br /> neighbors to have all construction traffic and the majority of ' + <br /> the -daily traffic go back through Willowbend. For environmental ���' • � <br /> K <br /> reasons, discussions with the conservation Comnnission and the + <br /> Board of Health, Attorney McElhin' ney also proposed to extend the <br /> existing serer system into the new section of Willowbend. Making A <br /> reference to the Plan, Attorney McElhinney stated the length to <br /> be approximately two hundred (2 o 0) plus or minus feet. He made <br /> it clear he .was not applying for a subdivision approval as the � ►{ <br /> '' pP <br /> area �n. question is not serving as frontage for anything, but <br /> simplyas an access connection. <br /> Attorney McElhinney 'stated•stated there has been preliminary <br /> discussion with Mr. Taylor, DPW, about blocking of f a section. as <br /> had been requested by the neighbors. Making references to the ,! <br /> Plan, Attorney McElhinney made references to Herring Gull Road, <br /> Simons Narrows Road and Mashp ee Neck Road. f <br /> Eµ <br /> Attorney McElhinney explained the request is for a <br /> todi.f ication to the Special Permit in as much as 'it would <br /> encroach upon the open space buffer around the perimeter of the ,. <br /> _2- , <br /> +t <br />