Laserfiche WebLink
ii <br /> LL <br /> fp <br /> Applicant to connect a minimum of twenty 2❑_ � �' � ) and tip to a total <br /> of thirty-eight (38) lots within. the Shoestring Bayy Subdivision <br /> to the sewer line. Language has also been added statingthat no <br /> more than two hundred for <br /> forty-nine t�49} homes are to be built In A <br /> Willowbend until such time as assurance is obtained from DEP " <br /> acknowledging adequate capacity. <br /> Attorney McElhinney stated he has met with Mr. Hart, an <br /> abutter, for discussion purposes regarding access/Herrin Gull { <br /> Road. g <br /> Attorney McElhinney also reported he has met with the Water <br /> District and is in receipt of a Memorandum of Understanding a ding <br /> authorizing installation of the water line 'connecting Willowbend <br /> Phase I to Herring Gull Road.. ;s <br /> Further, language has been included to assure these lots are <br /> tied into Willowbend Community Trust/Condominium regime and are .:f. <br /> referred to as building sites. <br /> At this point Attorney McElhinney provided copies of the <br /> P <br /> revised Draft Decision for all Board Members. <br /> There was some discussion between the Chairman and Mr. <br /> Hardman with reference to comments made by the Consulting <br /> Engineer regarding drainage issues. Mr. Hardman stated the <br /> runoff can be calculated and basins can be provided, as requested <br /> by the Consulting Engineer. The Chairman inquired as to the ' r <br /> drainage matter on Herring Gull Road. AttorneyMcElhinney <br /> y � <br /> responded Applicant would more than likelyprovide for a <br /> P .� <br /> gatehouse on the side of the road. Attorney McElhinney suggested <br /> this matter be further addressed by the Fire Chief and DPW <br /> Director. # <br /> The Chairman requested. Mr. Rowley address the matter of <br /> construction security, Mr. Rowley stated the development has <br /> been released in its entirety and that the roads have been i ji <br /> completed in accordance with the Rules and Regulations. Mr. <br /> Rowley acknowledged that although Applicant has always performed <br /> p <br /> their construction and maintenance in good form, the existing iR <br /> pavement in this area will have to be disturbed in order to <br /> install water and sewer. As a point of discussion, Mr. Rowley <br /> suggested the surface areas be inspected at some point after the <br /> construction is completed. Mr. Rowley stated that although the ± <br /> Planning Board has no jurisdiction at this point, the roads will ' <br /> be in a different condition than when they were released. <br /> AttorneyMcElhinney suggested he provide the P1 <br /> y gg p e Planning Board <br /> with a construction schedule, including specifications, and agree <br /> to a condition stipulating an inspection be made after the fact. , <br /> POINT OF INFORMATION: After some discussion, Attorney <br /> McElhinney agreed to the following: Acknowledgement of full <br /> 4- �� <br />