Laserfiche WebLink
4. Secondary Access Plan: <br /> This plan should show the suggested details for an exagerated crown on the road cross <br /> section and what will be used for stabilizing slopes and shoulders. Processed stone would be <br /> preferable to gravel. See review of 417/93. <br /> 5.Road Profiles: <br /> Show berms in the plan view. Calculations suggest a 22'wide pavement indicating 2W <br /> driving surface and V beans on each side. <br /> 4. Construction Details: <br /> Show loam and seed on all shoulders. <br /> Where wNl precast gutter Inlets be used on this project? If not.please delete. <br /> Make frame anchoring detail consistent for leaching pits and catch basins. <br /> Include this plan in the revised set of plans with a revised date. <br /> i <br /> f <br />