Laserfiche WebLink
4*� <br /> oti <br /> +� water to be shallow and muck in this area. <br /> WEI <br /> h Mr. Fudala stated this proposal to be included in the open <br /> 4`rIIt` Space Element of the Plan, recommended by the Conservation <br /> Commission and submitted to the State. <br /> Eric informed the Board of the acceptance and approval by <br /> the Waterways Commission with respect to the Project GREEN <br /> i program. <br /> Regarding the Fl oodpl ain issues, Eric explained that <br /> homeowners are now required to purchase flood insurance. <br /> ■ n regarding of r of this issue. ), <br /> There was discussion enforcement cement ) <br /> Eric discussed applying for the Community Rating System and <br /> informed the Board of a suggestion made by the waterways <br /> Commission to move this action item up to year two. In response <br /> to a question put by the Chairman, Eric responded that "yes" this <br /> ol issue has been discussed with the Building Inspector. <br /> I <br /> with regard to Nitrogen Loading, Eric discussed briefly the <br /> new Title V provisions. <br /> { I <br /> The Chairman recognized Mr. Hanks who commented the <br /> waterways Commission is in the process of reviewing the Draft <br /> Plan and their intention to submit comments to Eric for the <br /> f'�Et;l purpose of further discussion with the Shellfish Constable. <br /> The Chairman determined there to be no further public <br /> input. <br /> i• <br /> :tE f kl II Regarding the issue of "moving target, " Mr. Hanks suggested <br /> ; writing "The Plan is written to deal with as of (date) , " by way <br /> of a time frame. <br /> L•;IIIIP� <br /> a:ll,E <br /> i, Mr. Fudala stated the target date to be October, as adopted <br /> -, by Town Meeting, <br /> Eric Smith handed out a Map entitled, Proposed Nitrogen <br /> Analysis, (This matter concluded at 7:40 p.m. ) <br /> �E <br /> I <br /> Public Hearing - Joseph Breen - uashnet Woods <br /> } The Chairman recognized Michael McGrath and requested the <br /> engineering issues be addressed. Mr. McGrath made reference to <br /> the Plan and informed the Board that the amount of mortar being <br /> used on framing grates, catch basins, covers and frames on drain <br /> manholes has been increased. A separate Plan having been drawn <br /> ,•EI:.';ill k; <br /> to indicate monitor wells. <br /> '-' e Mr. Rowley reed that all engineering issues of concern <br /> 1. y agreed g g <br /> have been satisfied. <br /> ►r,;� There was some discussion regarding the location of wells. <br /> � I . 4— <br /> ,. <br /> r <br /> •E <br /> i r••i::'l���u3E <br /> , <br />