Laserfiche WebLink
F 4r <br /> tr <br /> f r� <br /> Item S. Okay. The Chairman Of <br /> r ■ r , y requested the words <br /> :�• R �} s <br /> condominium unit be used consistently throughout the document. M# <br /> C• i+ <br /> Item 6. Mr. Bornstein requested the flexibilityto #° <br /> construct eight (8) three 3 � �" >•�I <br /> 3 bedrooms units i f requested, as ., <br /> allowed within the original permit. Two three-bedrooms units <br /> have already been constructed.. The Board agreed <br /> g to this request , <br /> with the stipulation that language be added. "However, under no <br /> circumstances shall the total bedroom count r ' <br /> eN on the entire project <br /> exceed (the remaining number allowed to be built) ,' ., 'Y <br /> t <br /> Item 7. The last sentence is to be removed fros <br /> = the rl <br /> document and shall be listed as a Finding. All phases should be <br /> referred to as "annualized iced phases being tied into a one-year <br /> time period beginning at a definitive`' <br /> date which would be the .� <br /> recording of the Modification.i cat ion. I t was agreed there tit <br /> . g ere should be `� <br /> further discussion among the Town Planner, Attorney Butler and + 7 <br /> the developer., <br /> } Item 8. Applicant requested the ability to appear before _• <br /> ,F <br /> the Planning Board should they want to build additional r `r <br /> i garages ages <br /> under the Condition t be done only in locations where there is <br /> already existing impervious coverage ;� g y shown, so there would be no <br /> (net) increase. The Chairman stated dwelling ` <br /> units and garages <br /> are capped it 178-100 . The Town Planner suggested a r <br /> gg reference to <br /> Item 4 be made � <br /> Item 9 , Shall be changed to re � <br /> g ad the construction of a <br /> post office shall be constructed only after approval of the <br /> Planning Board is made. The Chairman brought u the <br /> g p issue L , <br /> of the construction entrance; and also suggested . <br /> gg to that before <br /> a' <br /> any construction begins, the buffer area. adjacent to Timber �; ' <br /> Landing be properly revs etated as well as some are <br /> as within A <br /> g <br /> the buffer zone along Great Neck Road. The Chairman further <br /> suggest a plan be drawn and filed with Design review t o restore ''"All <br /> t; �the Timber Landing area. There was some discussion regarding 40 <br /> g, g � <br /> the location of a construction road, The Town Planner informed <br /> the ' ��. <br /> Board of a letter previously received from the Police Chief <br /> regarding the possibility it of adding an emergency '° <br /> P y g■ � cy entrance. to the <br /> project {for Poi.ice/Fare vehicles in the event h <br /> � i the main entrance , <br /> were to be blocked f or any period of time. There was some <br /> discussion regarding a suitable location for n x, g g a emergency access <br /> including Timber Landing, Com Electric easement or the AIµ <br /> ■ g� <br /> construction access/gated. Attorney Butler indicated certain <br /> Possible locations on the Plan for the benefit of Board/Unit <br /> Owners, for Emergency, Main and Construction ' <br /> g y. st uction Entrances. It was <br /> agreed that AttorneyButler <br /> utler would investigate the possab` izlty of <br /> using the Corn Electric easement first and then explore other <br /> Possibilities. The Chairman suggested " . ■ .and shall. beproperly <br /> - 9'g <br /> r <br /> estored to the satisfaction of the Board and maintained at all <br /> times..." be included with reference to the construction (All <br /> entrance. Dennis Balzarini asked if the clubhouse has been <br /> factored into he 17 ' <br /> t 8 number; Attorney Butler agreed to double <br /> check., _11 <br /> m <br /> E f <br />