My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/13/2009 ZONING BOARD OF APPEALS Minutes
>
05/13/2009 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2022 5:01:06 PM
Creation date
1/28/2022 3:53:24 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
05/13/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Zoning Shane Caiazzo 3 <br /> Board of Appeals <br /> SP-09-18 <br /> GENERAL FINDINGS <br /> 1. that the subject property is located at 8 Chart Way and contains 23,501 square <br /> feet. <br /> SPECIFIC FINDINGS <br /> The Board determined that: <br /> 1. there is adequate land area to provide sufficient parking. <br /> 2. the immediate neighborhood consists of single-family homes of similar size; <br /> many of which have been improved with additions or reconstruction. <br /> 3. there will be the installation of a Title V septic system. <br /> 4. the proposed dwelling will be less non-conforming that what currently exists <br /> now. <br /> 5. there shall be no visible noise generating mechanical equipment installed <br /> adjacent to 9 Chart Way and shall be located on the Creek Side. <br /> In view of the foregoing, the Mashpee Zoning Board of Appeals found that the <br /> Petitioner met the criteria necessary for the granting of a Special Permit. Upon motion <br /> duly made and seconded, the Zoning Board of Appeals voted unanimously on May 13, <br /> 2009 to grant a Special Permit to raze, change and alter the existing dwelling on the <br /> subject property. The Special Permit is conditioned on plans from Falmouth <br /> Engineering, plot plan by Engineering Works, Inc. of Forestdale and surveying done by <br /> Hood Survey Group of Sandwich, dated January 5, 2009, revised February 5, 2009, <br /> February 10, 2009, February 12, 2009, April 9, 2009 and April 15, 2009. <br />
The URL can be used to link to this page
Your browser does not support the video tag.