Laserfiche WebLink
3 <br /> Mashpee Zoning <br /> Board of Appeals Nancy Kerrigan V-02-118 <br /> 4. the lot has been maintained as a separate buildable lot on the Assessor's A <br /> Records and is subject to betterments from the Water District; therefore, a B <br /> literal enforcement of the By-laws would involve hardship to the Petitioner. <br /> In view of the foregoing, the Mashpee Zoning Board of Appeals found that the <br /> applicant met the criteria necessary for the granting of a Variance. Upon motion duly <br /> made and seconded, the Zoning Board of Appeals voted unanimously November 13, <br /> 2002 to grant the following in accordance with a plan from Cape &Islands Engineering <br /> entitled "Proposed Roadway Construction Located in Mashpee, MA,prepared for <br /> t <br /> McShane Construction, dated November 12, 2002, File 189 MA. Scale 1" = 40' for <br /> Lettie Lane: I <br /> variance for fire apparatus to have adequate access to Goodspeed <br /> Meetinghouse Road, Mashpee, MA with a 20 foot wide asphalt paved <br /> roadway. <br /> L <br /> I <br />