Laserfiche WebLink
In <br /> Is <br /> Applicant.,, Daniel Hostetter <br /> Requestm, 2-lot ANR as modification of the Special <br /> Tony Ferragamo stepped down. <br /> Mr, Kevion Kiorrane was present representiong the applicant. <br /> Louise made a motion to accept the modification to the <br /> Special Permit. All other Board members were 'in favor. <br /> DISCUSSION <br /> Applicante. Fields Polont Limited Partnership <br /> 0 Job's Fishing <br /> FieldsRequest: Discussion of <br /> Doug Storrs , Buf f Chase and attorney John P mike were present <br /> representing <br /> Point. <br /> They were present to move the matter of Jobs Fishing Road <br /> Buff stated that they are prepared to mov'e ahead. They have <br /> no problem with plan that has been submi' tted. He asked if <br /> there ims an agreement on design of the road.? <br /> Tony stated that an issue arose during their previous <br /> discussion, it must be determined which Jobs Fieshing Rd Town <br /> Meeting acted on. They cannot change what was voted at Town <br /> Buff stated they have designed it three tiume, Rotary bypass <br /> is the 4th understanding. <br /> Wayne was unable to discuss the matter with Joe Murphy, <br /> Tom stated that they would not have to go to Town Meet ing <br /> for what was proposed for thims road. The width of layout <br /> would have to go back to Town Meeting to be changed. <br /> Louise asked 'if the walkway and bike path are combined? <br /> Tom stated that it is a concept that by pass committee came <br /> ' th, no other place to put blake path. The layout 'is <br /> up w:L <br /> Selectman W1011 Hanson was also <br /> wide enough that it meets standards.. <br /> Doug explained that they used the BSC rw <br /> f <br /> 8 <br />