My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-Annual Town Report
>
2017-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 5:05:02 PM
Creation date
6/23/2022 3:45:39 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Design work continued for reconstruction and term/low cost such as vegetation trimming and signal <br /> improvement of Route 151. The project will ultimately timing adjustments to long-term/high cost such as <br /> include upgrading of the traffic signals, extension of installation of a traffic signal or roundabout at Bowdoin <br /> the multi-use path along the entire corridor in Mashpee, Road and installation of sidewalks and/or a multi-use <br /> construction of a sidewalk from Old Barnstable Road to path. The final report is due in February 2018. Route <br /> Winslow Drive,improvement of signage and lighting, 28 is owned and maintained by MassDOT. <br /> and improvement/lane reconfigurations at various <br /> intersections as well as reconstruction of the road itself. The Town cooperated with the Mashpee <br /> Construction funding for the project will be through the Wampanoag Tribe in the submittal of an application for <br /> Cape Cod Transportation Improvement Program and is a grant for survey/design from the Federal Highway <br /> tentatively scheduled for FFY20/21. Design is being Administration's Tribal Transportation Program Safety <br /> funded through Chapter 90. Twenty-five percent Program for drainage, pedestrian, and road <br /> (25%) design plans were submitted to MassDOT in improvements on Old Barnstable Road. A decision on <br /> November 2017. award is expected in Spring 2018. <br /> Replacement of the culvert on Quinaquisset SPECIAL PROJECTS <br /> Avenue at Willowbend was completed in November Construction for the replacement of the ramp at <br /> 2017. The new culvert is re-aligned under the road Great River Boat Ramp with a double wide ramp began <br /> and meets current stream crossing standards. A new in September 2017. Work included demolition of the <br /> water control structure for operation of the adjacent existing ramp, installation of a coffer dam and <br /> cranberry bogs was also installed. Final paving will be dewatering of the site, and construction of the new <br /> completed in Spring 2018. The work was funded concrete ramp with center platform. Installation of the <br /> through Chapter 90. floats is scheduled for Spring 2018 as well as final <br /> A contract was awarded in December 2017 for paving of the parking lot and construction of a <br /> survey/engineering for drainage improvements, kayak/canoe drop-off. This project is being funded <br /> potential intersection improvements, and sidewalk through the Community Preservation Act. <br /> construction on Cotuit Road. The road will also be Replacement of a playground at the KC Coombs <br /> resurfaced as part of the project. Work is tentatively School was completed in April 2017. The playground <br /> scheduled to begin in Fall 2018 with completion in includes age appropriate climbing structures with <br /> Spring 2019.The work will be funded through Chapter safety surfacing(poured in place rubber). This project <br /> 90. was funded through the Community Preservation Act. <br /> A grant was received from the MA Division of Replacement of a playground at the Quashnet <br /> Ecological Restoration for design of a new culvert for School was completed in Summer 2017. The <br /> the Santuit River at the Town Line on Sampson's Mill playground includes age appropriate climbing <br /> Road . The culvert provides passage for river herring structures with safety surfacing (poured in place <br /> from Shoestring Bay to the fish ladder at Santuit Pond. rubber),picnic tables with a shade structure,and new <br /> Santuir River is also habitat for sea-run brook trout. fencing. This project was funded through the <br /> Survey/engineering/design will be completed in Spring Community Preservation Act. <br /> 2018. The tentative schedule proposes completion of <br /> permitting by Fall 2018 with construction to follow. Reconstruction of the basketball (2) and tennis <br /> The project will be coordinated with the Town of courts (6) was completed in Summer 2017. Work <br /> Barnstable who shares ownership of the culvert. A included reclamation of the existing courts,paving of <br /> grant through the USDA Natural Resources new courts, color-coating of the courts, provision of <br /> Conservation Service is being pursued for construction. new tennis court nets,and installation of new fencing. <br /> This project was funded through the Community <br /> The Town participated with the Cape Cod Preservation Act. <br /> Commission on a corridor study of Route 28 from <br /> Orchard Road/Asher's Path to the Mashpee-Barnstable Construction of a picnic pavilion with public <br /> Town Line. Two public meetings were held at the bathrooms at Heritage Park was completed in Summer <br /> Mashpee Public Library to gather input. 2017. The project was funded through the Community <br /> Recommendations reviewed varied from short- Preservation Act. <br /> 132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.