Laserfiche WebLink
Survey/engineering/design was completed for lot. Landscaping of the parking lot will be completed <br /> replacement of the culvert for the Santuit River at the in late Spring 2019. This project is being funded <br /> Town Line on Sampson's Mill Road. The design was through the Community Preservation Act. <br /> funded by a grant received from the MA Division of <br /> Ecological Restoration. The culvert provides passage Design and construction of the Mashpee <br /> for river herring from Shoestring Bay to the fish ladder Pickleball Park on Ashumet Road was completed in <br /> at Santuit Pond. Santuit River is also habitat for sea- June 2018. The park,located adjacent to the Mashpee <br /> run brook trout. Permitting required for the new culvert Dog Park,includes 8 dedicated Pickleball courts with <br /> began in Summer 2018 and is still ongoing. The parking. This project is being funded through the <br /> tentative schedule proposes to start storm water Community Preservation Act. <br /> improvements on Sampson's Mill Road during late <br /> Spring 2019 with replacement of the culvert occurring Design and permitting of a new parking lot at <br /> in Summer 2019(there is a time of year restriction for Ockway Bay Boat Ramp was completed in Summer <br /> work due to herring migration into/out of Santuit 2018. Construction of the parking lot is scheduled for <br /> Pond). A$390,000 grant was received through the late Winter/Spring 2019. The binder paving will be <br /> USDA Natural Resources Conservation Service for completed by Memorial Day so the parking lot is <br /> construction. The project and balance of funding will available for use during the upcoming boating season. <br /> be coordinated with the Town of Barnstable who shares <br /> ownership of the culvert. Building Projects <br /> The Town continues to work with Cape Light <br /> The Cape Cod Commission issued the final report Compact (CLC), National Grid, and Green <br /> for the corridor study of Route 28 from Orchard Communities to implement energy efficiency projects <br /> Road/Asher's Path to the Mashpee-Barnstable Town at Town buildings. See the report of the Planning & <br /> Line in February 2018. The report is available on the Construction Committee for a list of projects <br /> Town's website at www.mashpeema.gov/public- completed/proposed with these funds. <br /> works/studies. The report included recommendations <br /> for short-term/low cost such as vegetation trimming A Capital Improvement Bond was approved at the <br /> and signal timing adjustments to long-term/high cost May 2017 Annual Town Meeting. See the report of the <br /> such as installation of a traffic signal or roundabout at Planning & Construction Committee for a list of <br /> Bowdoin Road and installation of sidewalks and/or a projects completed/proposed with these funds. <br /> multi-use path. Route 28 is owned and maintained by <br /> MassDOT. The Town will be working with MassDOT Replacement of the windows/doors/roof at the <br /> on implementation of these recommendations. Quashnet School was completed in 2018. Funding for <br /> the project had been approved at the May 2017 Annual <br /> The Mashpee Wampanoag Tribe received a grant Town Meeting and a construction contract awarded in <br /> for survey/design from the Federal Highway December 2017. See the report of the Planning & <br /> Administration's Tribal Transportation Program Safety Construction Committee for an update on the project. <br /> Program for drainage, pedestrian, and road <br /> improvements on Old Barnstable Road. The Town will Projects completed over the year on Town <br /> be working with the Tribe through 2019 on completion buildings and facilities (all except the schools) were: <br /> of design of this project. replacement of the roof on the two-story section of the <br /> Police Station and installation of access control for the <br /> Special Projects doors at the Fire Station Headquarters. <br /> Construction for the replacement of the ramp at <br /> Great River Boat Ramp with a double wide ramp was Over the year,the following work additional work <br /> completed in Spring 2018. The project included was completed in the three school buildings: at <br /> demolition of the existing ramp,installation of a coffer Middle/High School — carpet replacement in <br /> dam and dewatering of the site,construction of the new classrooms; at KC Coombs School — installation of <br /> concrete ramp with center platform,installation of new access control on four additional exterior doors, <br /> marine-grade aluminum floats, construction of a renovation of two student bathrooms; at uashnet <br /> kayak/canoe drop-off,and final paving of the parking School—no additional projects. <br /> 142 <br />