My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-Annual Town Report
>
2018-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 5:02:38 PM
Creation date
6/23/2022 3:46:34 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
English Language Educator at the Quashnet School. <br /> Miss Forsberg taught Grade 6 and Grade 4 while at <br /> Quashnet School. Both teachers relocated out of the <br /> area.Their tenure with Quashnet School was short,but _ <br /> their impact on student learning was significant.Thank z — e <br /> w� <br /> you Mrs.Wendy Lithwin,who retired from Quashnet <br /> School in October of the 2017-2018 school year.Mrs. <br /> Lithwin served the Mashpee Public Schools as an r <br /> assistant principal and principal of the Kenneth C. E <br /> Coombs School transferring to Quashnet School prior to retirement. Her compassion and dedication to the <br /> field of education were evident in her interactions with ��- <br /> students, families, and staff. Mrs. Lithwin dedicated <br /> over 30 years to public education.Her commitment to <br /> improving educational opportunities for all students is - <br /> admirable. <br /> The most impactful event on our school b" <br /> community during the 2017-2018 school year was the <br /> start of the long-awaited Quashnet Window and Roof <br /> Repair Project. Construction activity began in the <br /> winter months with early indoor preparation.By April, <br /> selected classrooms were on the move to temporary <br /> locations within the building. Students carried their <br /> belongings and teachers rolled their materials down the ^µ <br /> hallways.Instruction was never impacted or interrupted _ <br /> during each phase of construction. Access was limited <br /> in the building,but with the careful planning with the <br /> contractor and with Mashpee DPW the overall impact <br /> 4 <br /> during the school year was minimal. June 20, 2018, <br /> was the last day of school with a half day for students. - <br /> As soon as the buses rolled out of the parking lot, <br /> contractors swarmed the school.By noon,the gym was <br /> a hard hat area only. On June 21 st, the building was <br /> turned over to the contractors exclusively and the <br /> Quashnet School office was relocated to the Kenneth <br /> C.Coombs School.We are very grateful to the voters y <br /> in Mashpee for supporting this investment in the =`■ <br /> Quashnet School building to benefit students,staff,and <br /> continued community use. We look forward to a <br /> completion date in January 2019. <br /> 152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.