My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-Annual Town Report
>
2021-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 5:02:56 PM
Creation date
6/23/2022 3:47:25 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town Line. It will include (1) extension of multi-use <br /> Report of the path on the north side of Route 151 from Old <br /> Department of Public Works Barnstable Road to James Circle; (2)construction of a <br /> sidewalk on the south side of Route 151 from Old <br /> Barnstable Road to Winslow Drive; (3) provision of <br /> To the Honorable Board of Selectmen and the left-turn lanes at Algonquin Avenue; (4)provision of a <br /> Citizens of the Town of Mashpee: center turn lane from Ninigret Avenue to Old Brickyard <br /> Road; (5) drainage improvements and reconstruction <br /> In 2021, the Department of Public Works and of the road itself. Design is being funded through <br /> performed its normal operations for maintaining the Chapter 90. Phase 2 is currently scheduled for <br /> town roads, buildings, and properties including construction in Federal Fiscal Year 2026 through 2027. <br /> Heritage Park,South Cape Beach,the Transfer Station, Go to the Town's website at <br /> and Great Neck Woods Cemetery. htips://www.mashpeema.govL/public- <br /> Below s/route-151-corridor-improvement <br /> Below are highlights of several specific activities s for more information. <br /> during the past year. <br /> Realignment of the intersection of Cotuit <br /> Road Projects Road/Route 130 was completed. This was the final <br /> The remaining roads in Santuit Pond Estates were component of the project with included drainage <br /> resurfaced with drainage improvements — Bayberry installation,construction of a sidewalk on the east side <br /> Drive,Fawn Road,and Deerfoot Circle. Sunset Circle of the road, and resurfacing of the road up to the <br /> in John's Pond Estates was also resurfaced with Mashpee—Sandwich Town Line just north of Somerset <br /> drainage improvements. John's Pond Estates will be Road. The project was funded through Chapter 90. <br /> the neighborhood focus for resurfacing over the next Drainage and resurfacing of the northern section of <br /> few budget years. The projects were funded through Cotuit Road was completed in Spring 2021 with <br /> the DPW Operational Budget(FY21 and FY22). funding through the FY21 DPW Operational Budget. <br /> Design work for Phase 1 was completed for Drainage improvements and resurfacing of Red <br /> reconstruction and improvement of Route 151. Phase Brook Road were completed in Fall 2022. This project <br /> 1 will extend from approximately 900 feet west of Old was funded through Chapter 90. <br /> Barnstable Road to the Mashpee Rotary. MassDOT <br /> awarded a contract for construction to Lawrence Lynch Drainage improvements were completed on a <br /> Corp. in November 2021. Work is scheduled to start portion of Route 130 in Fall 2022. This work was <br /> in Spring 2022 and will extend for several years. Work funded through Chapter 90. <br /> will include (1) reconfiguration of the intersection at <br /> Old Barnstable Road to include dedicated right, thru, A conceptual design for replacement of the traffic <br /> and left turn lanes on Old Barnstable Road in each signal at Great Neck Road North/Route 130 with a <br /> direction; (2) reconfiguration of the intersection at roundabout was presented to the Selectboard on <br /> Frank E. Hicks Drive/Job's Fishing Road to include a 12/6/21. The Board voted 5-0 to proceed with final <br /> right turn lane from Route 151 onto Job's Fishing design/engineering plans for a roundabout. Design will <br /> Road; (3)widening of multi-use path on the north side begin in 2022. <br /> of Route 151 from Old Barnstable Road to Frank E. <br /> Hicks Drive and extension of the path to North Market The Mashpee Wampanoag Tribe received a grant <br /> Street; (4)construction of a sidewalk on the south side for survey/design from the Federal Highway <br /> of Route 151 from Old Barnstable Road to Job's Administration's Tribal Transportation Program Safety <br /> Fishing Road; (5) drainage improvements and Program for drainage, pedestrian, and road <br /> reconstruction and of the road itself. Construction is improvements on Old Barnstable Road. The Town will <br /> being funded through the Cape Cod Transportation continue to work with the Tribe through 2022 on <br /> Improvement Program (state and federal monies). completion of design of this project. <br /> Design for Phase 2 of the project is continuing. This <br /> phase extends from Phase 1 to the Mashpee-Falmouth <br /> 134 <br />
The URL can be used to link to this page
Your browser does not support the video tag.