My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-Annual Town Report
>
2021-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 5:02:56 PM
Creation date
6/23/2022 3:47:25 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
which include Town Meeting and Ballot Question <br /> Report of the approval of the required construction funds by June 31 <br /> Sewer Commission and submission of 90% complete plans to Mass DEP <br /> before October.In order to have the interest rate on the <br /> loan be reduced from 2% to 0%, a significant cost <br /> To the Honorable Board of Selectmen and the savings to the Town, Town Meeting will also have to <br /> Citizens of the Town of Mashpee: adopt a"Growth Neutral"bylaw.)GHD began work in <br /> September on the final Phase 1 designs and had made <br /> The Commission made major progress in 2021 significant progress by the end of the year. Weston & <br /> toward achieving the work outlined in the Watershed Sampson has also been engaged to provide limited <br /> Nitrogen Management Plan(WNMP)developed by the input regarding the design. Should all the necessary <br /> Commission and our consultants and approved by the funding be approved,the intent is to put the project out <br /> state(MEPA and DEP)in 2015. to bid in November 2021, with construction occurring <br /> between spring 2022 and spring 2024. As a result, we <br /> In January the Commission's consultant, GHD should finally have the first section of the Town's sewer <br /> Inc., delivered their final report on preliminary design system operating by the end of 2024. <br /> of the treatment plant specified in the Plan to be located <br /> adjacent to the Town's trash transfer station,along with As a result of proposed reconstruction of Route <br /> the first phase of the sewer collection system (located 151 and a 5-year prohibition on opening the pavement <br /> roughly between the Town Hall and the Clipper Ship on that state-funded project once it is completed, the <br /> Village subdivision on the east side of the Mashpee Selectmen submitted an article on the October Town <br /> River) as part of Phase 1 of the Plan. As part of the Meeting warrant for$490,200 for limited design of the <br /> design development, a separate Value Engineering sewer facilities in that area(part of the Plan's Phase 2) <br /> Study of GHD's proposals was conducted by the firm so that any necessary sewer lines can be constructed <br /> of Weston & Sampson to review GHD's work and under Route 151 west of Old Barnstable Road prior to <br /> suggest potential improvements and cost savings. The the road construction.The article was approved,though <br /> Weston&Sampson report was also delivered at a joint the design work had not begun by the end of the year. <br /> meeting of the Commission, GHD and Weston & <br /> Sampson in January 2020. A number of Weston & The WNMP describes work to be done in five 5- <br /> Sampson's suggestions were well-received and will be year phases.As each phase is completed,the condition <br /> incorporated in the final design of the treatment plant. of our waterways and other factors will be analyzed to <br /> The preliminary design incorporated extensive natural determine how well the plan is working toward <br /> forest buffers surrounding the facility,along with"belt achieving the nitrogen targets set by the EPA for our <br /> and suspenders" odor control equipment to minimize estuaries and whether adjustments need to be made to <br /> any impacts on the surrounding area, as had been the Plan (a process referred to as "adaptive <br /> promised to neighborhood residents. management").This adaptive management approach is <br /> particularly important as the Plan relies on removing a <br /> Of greatest importance,the Spring Town Meeting significant portion of the water column nitrogen load <br /> and election authorized funding, in the amount of through seeding and commercial harvesting of large <br /> $2,475,500, for development of final designs for the numbers (millions) of shellfish in Hamblin and Jehu <br /> Phase 1 facilities, for which the Commission is Ponds,Great and Little Rivers and Ockway Bay, and a <br /> sincerely grateful. The funding approval also allowed significant expansion of current oyster propagation and <br /> the Commission to begin the process of seeking 0% harvesting efforts in the Mashpee River, Shoestring <br /> interest borrowing from the State's Clean Water Bay and Popponesset Bay. Our hope is to reduce the <br /> Revolving Fund (SRF), with GHD's submission in area of the Town that has to be sewered(thus reducing <br /> August of our Clean Water Construction Project resulting costs significantly). The Department of <br /> Evaluation Form (PEF) aimed at qualifying for the Natural Resources is making steady progress with <br /> 2021 SRF funding round. (Based on the PEF,we were shellfish propagation and seeding. <br /> informed in January 2021 that our project was ranked <br /> 12th in the state and highest on Cape Cod, which The Plan anticipates that the western portion of <br /> virtually guarantees that we will receive an SRF loan the town's sewage be sent to a treatment plant on Joint <br /> if we complete the other required steps in the process, Base Cape Cod to be shared with Sandwich and the <br /> 159 <br />
The URL can be used to link to this page
Your browser does not support the video tag.