Laserfiche WebLink
Outreach Center's Grace Center in New Seabury, at assist in moving Phase 1 forward.This department has <br /> your home if you are housebound,or any location that provided a second set of eyes for a Professional <br /> is best for you. Engineer review of the design plans and to oversee the <br /> permits. The review resulted in design changes that <br /> We are also happy to report that we have a new generated an alternate design of Phase 1 that is <br /> Veterans District web site at www.capevetLorg. You substantially more cost effective and a higher quality <br /> can fill out our intake form, use our Massachusetts product for the Town. In concert with Town counsel <br /> Veteran's Benefits Calculator and file VA claims online. this department assisted in preparation of plans, land <br /> taking documents and deed descriptions for easements <br /> In Service to Veterans, required for Phase 1 construction. Successful public <br /> Gregory J. Quilty outreach helped accomplish taking acquisitions. This <br /> Director,Department of Veterans'Services department also created draft Rules and Regulations for <br /> Mashpee Sewer System with much help from <br /> Commissioner Joe Lyons. <br /> Report of the Phase 1's design plans and permits should be <br /> completed soon and the project is scheduled to put out <br /> Wastewater Management for bid in the Spring of 2022. Bid award is scheduled <br /> Department prior to the end of June 2022. The final permits are <br /> MassDOT, DEP Groundwater Discharge Permit, <br /> Massachusetts Historical Commission and finally DEP <br /> To the Honorable Select Board and the SRF approval.This department was part of the required <br /> Citizens of the Town of Mashpee: Pre-Qualification Committee and completed the <br /> process to select all potential bidders for the <br /> It is my honor to submit the first annual report to Wastewater Treatment Facility(WWTF)located at Site <br /> you for both of these newly created departments.As of 4 near the Transfer Station. Environmental Partners <br /> now both departments consist of one employee,myself Group was selected as the Outside Project Manager <br /> Chris Gallagher!! Also,I am honored to be selected as (OPM), at a very competitive price, to oversee the <br /> Mashpee's first Town Engineer and Director of the construction of the WWTF and the Collection System <br /> Wastewater Management Department.This department that was designed by GHD. The departments, as well <br /> will be an integral part in the design and as most of the citizens of Mashpee, are very excited to <br /> implementation of perhaps one of the largest projects start construction of the Phase 1 sewer system. <br /> the town has ever or will undertake in its history. The <br /> role(s) of these positions are evolving weekly and still The Sewer Commission, with the assistance of <br /> being defined. One role is to interact with other Town the Town Engineer,is also moving forward with Phase <br /> departments and assist as needed.This department has 2 to continue to address nitrogen removal in Mashpee's <br /> worked closely with the Zoning and Building valuable water resources.Phase 2 consists of 5 subareas <br /> Departments to provide engineering and zoning bylaw located around freshwater ponds and saltwater <br /> expertise for the various petitions in front of them and estuaries. The freshwater ponds consist of Mashpee- <br /> also to attend meetings. Both departments and the Wakeby, Santuit, John's and Ashumet Ponds. The <br /> Board of Appeals consist of a fantastic group of very remainder of Mashpee Neck not covered under Phase <br /> qualified and dedicated people. 1 is also proposed to be sewered in Phase 2. This will <br /> necessitate an upgrade to the proposed Phase 1 WWTF <br /> The main focus of this departments has been to treat the additional flows. The WWTF design <br /> assisting in implementing the design, permitting and anticipated and reserved room for most of the upgrades. <br /> construction of the Wastewater Management System. An article is proposed for inclusion in the Spring 2022 <br /> It is the goal to have design and permit completion and Town Meeting to fund the design of the various Phase <br /> contract award of Phase 1 within the first year of the 2 sections. A preliminary design will be used to <br /> inception of this department. Phase 1 consists of just determine a probable cost of each section before <br /> under 6 miles of gravity sewer, 3 pump stations and a moving forward. <br /> Wastewater Treatment Facility located adjacent to the <br /> Transfer Station. Many tasks have been performed to <br /> 161 <br />