My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/27/2022 SELECT BOARD Minutes
>
06/27/2022 SELECT BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2025 8:37:30 AM
Creation date
7/28/2022 10:14:40 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
06/27/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5 <br />Mashpee Select Board <br />Minutes <br />June 27, 2022 <br />APPOINTMENTS & HEARINGS <br />Award of Contract formReptacement of Electric Partition at, Town wHall: (continued) <br />Motion made by Selectman Cotton to accept the recommendation of the DPW Director and award a <br />contract to The Pappas Company in the amount of $62,700 for the Town Hall Partition to include Bid <br />Alternate No.1. <br />Motion seconded by Selectman Sherman. <br />VOTE: Unanimous. 5-0. <br />Roll Call Vote: <br />Selectman Gottlieb, yes Selectman Weeden, yes Selectman Cotton, yes <br />Selectman O'Hara, yes Selectman Sherman, yes Opposed, none <br />UpdateonWastewater Project: Ray Jack: <br />The Select Board met with Ray Jack, engineer to discuss the status of Phase I associated to the Wastewater <br />Plan. Appreciation was given to Mr. Jack for his expertise and for taking on this project and moving it forward <br />for the Town of Mashpee. It was agreed the Wastewater Project would be a regular update on the Select <br />Board's agenda. <br />Mr. Jack gave a brief PowerPoint presentation on the project status. It was disclosed the mandatory pre - <br />qualification process for the General Contractor and Sub -bidders is complete. All (3) contracts are currently <br />being advertised in the Central Register. <br />In the process the Sub -contractors bid opening occurs before the General Contractor bid opening. Sub- <br />contractor bids are scheduled to be open on August 9, 2022. The General Contractor bid opening is scheduled <br />on August 11, 2022. The contract execution for both bids is September 30, 2022. <br />The bidding includes; Water Resource Recovery Facility (WRRF) General Contractor and Sub -contractors <br />under Contract # 1 as referenced. <br />Under Contract #2, the bid opening for Collection System North is August 4, 2022. Contract #3 Collection <br />System South bid opening is August 11, 2022. The contract execution for these bids is also September 30, <br />2022. <br />Mr. Jack gave a brief overview of the bid process under Phase I contracts. Within Contract # 1 WRU, a new <br />Membrane Biological Reactor (MBR) facility would be constructed south of the Transfer Station. The Average <br />Daily Flow (ADF) is 120k/GPD. The Maximum Daily Flow is 360K/Gallons Per Day. <br />The Collection System North under Contract #2 is planned North of Route 28. Contract #3 Collection System <br />South, south of Route 28 includes (3) lift stations to be located on Falmouth Road, Brewster Road and Mashpee <br />Neck Road. <br />The resource recovery process and its capacity as well as expansion and discharge were briefly reviewed. <br />When the plant is online actual flows would be determined and assist with the data review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.