My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/21/2022 PLANNING BOARD Minutes
>
09/21/2022 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 2:58:25 PM
Creation date
11/7/2022 10:03:44 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
09/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
16 Great Neck Road North <br />Mashpee, .Massachusetts 02649 <br />Attorney Christopher Kirrane is present tonight on behalf of his client. He submit a letter this <br />afternoon requesting a further continuance. Unfortunately, negotiations between the two parties <br />broke down and they were not able to reach an agreement. They will put forth a revised and <br />updated subdivision plan for the Board's consideration for the October 19tn Public Hearing as <br />requested. They took the recommendation of the Board to make an effort in reaching an <br />agreement, but the two parties needed to agree on a deal and they were not able to. Mr. Kirrane <br />spoke with Mr. Lehrer and was told that meeting date should be sufficient for the hearing. <br />Mr. Lehrer commented he is unaware of the full modifications to the plans, and he requested <br />those modifications get to the Planning Department as soon as possible so they can be given to <br />Mr. Pesce to allow for enough time for written comment for the Planning Board. <br />Mr. Kirrane noted they will be adding the four acres of open space that will have to go to the <br />Conservation Commission. There may have been initial comments from Mr. Pesce that will need <br />to be incorporated as well as anything else, they will be ready for October 19tn <br />Mr. Lehrer asked if it has been indicated by Mr. Mallegni's engineers or surveyor relative to the <br />scope, if modification is limited to only the open space contribution. If that is the case, Mr. Pesce <br />already delivered a report, so if there is no modification to the proposed layout or technical <br />matter, with regard to construction, they wouldn't need an additional report from Mr. Pesce. <br />Ms. Waygan commented she would like to still have Mr. Pesce look it over. She noted it has <br />been a while and she would like to make sure his report is up to date. She would also like to ask <br />the project proponent to review those initial meetings and read comments from the abutters and <br />to address those previous comments. <br />Mr. Kirrane referenced one comment from one of the owners on Ashumet, those concerns are <br />going to be allayed given the 4 acres is going to be contributed. He will review with the applicant. <br />They put all their efforts into making this deal happen, now they have to pivot and they will review <br />everything and get back before the Board. <br />Ms. Waygan anticipates the abutters will be present at the meeting. She just wants to be ready <br />to address all their concerns. <br />Mr. Lehrer commented prior to the first continuance, he delivered a memo to the Board that he <br />will be resending. Based on the location of the proposed roadway in consideration of <br />intersections and adjacent roadways, a traffic study with the relative specified scope of work will <br />t* <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.