My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/27/2023 SELECT BOARD Minutes
>
02/27/2023 SELECT BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 4:30:27 PM
Creation date
3/14/2023 3:21:02 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
02/27/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7 <br />Mashpee Select Board <br />Minutes <br />February 27, 2023 <br />Update on the Wastewater Project: Rai Jack: <br />The Select Board met with Raymond Jack to further review the progress of the Phase I Wastewater Plan. <br />The contracts associated to his phase include; <br />Contract #I — Water Resource Recovery Facility — New MBR Facility (South of the Transfer Station) <br />Contract #2 — Collection System North (North of Route 28) <br />Contract #3 — Collection System South (South of Route 28), Includes 3 Lift Stations <br />The adjusted Contract #1, $27,905,000 with a $1,507,000 change order for the carbon scrubber and 2 <br />additional process tanks; $29,502,000 adjusted contract value is moving forward to project completion. It <br />is anticipated the Phase I project would be completed by December 1, 2024. <br />It was noted the additional tanks would represent an overall cost savings, give capacity through Phase II, <br />and avoid disruption and risks in digging if the tanks were installed after the initial construction. For cost <br />effectiveness and warranties, the additional process tanks will not be equipped until they are ready for <br />use. <br />Contract #2 North $5,024,198 is 19.6% complete with no change orders anticipated. Contract #3 South <br />$9,806,731 (Base bid with wet well coating and lift stations), no change orders to date. <br />Mr. Jack indicated the State Revolving Fund (SRF) 0% interest loan was approved in January 2023 for <br />$54 million. The Town of Mashpee is on the Intended Use Plan (IUP) list for the additional $12 million <br />required to complete Phase I construction. A May 2023 Town Meeting article is on the warrant to <br />complete the project. <br />It is anticipated that roadwork on Route 28 from the Mashpee Rotary to Orchard Road would commence <br />in early April. The Town is applying for a state permit to conduct the work. When approved the Town is <br />expected to give ample notification to the road construction project and use of alternate detour roads. <br />Notification would include a specific email address for public comment and concerns. <br />Discussion wand Alrovalwof the FollowinResgnations and Appointments; <br />Resignation: Mash. ee Inclusion and Divers il; Committee_(TermmmEx ices Junew30 g2023 wwRachael„Hicks: <br />Correspondence was received from Rachael Hicks dated February 21, 2023 resigning from the Mashpee <br />Inclusion and Diversity Committee. <br />Motion made by Selectman Sherman to accept the resignation of Rachael Hicks from the Mashpee <br />Inclusion and Diversity Committee sending a letter of appreciation to Ms. Hicks for her service. <br />Motion seconded by Selectman Cotton. <br />VOTE: Unanimous. 5-0. <br />Roll Call Vote: <br />Selectman Weeden, yes Selectman Cotton, yes Selectman O'Hara, yes <br />Selectman Sherman, yes Selectman Wyman -Colombo, yes Opposed, none <br />
The URL can be used to link to this page
Your browser does not support the video tag.