My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/17/2023 PLANNING BOARD Minutes
>
05/17/2023 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 2:37:54 PM
Creation date
6/9/2023 3:11:27 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
05/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
16 Great Neck R.oadWorth <br />Mashpee, JWassachusetts 02649 <br />Mr. Richardson stated he thinks you should be able to be elected and appointed. <br />Ms. Waygan thinks there should be a Planning Board member on the Affordable Housing <br />Committee. <br />Mr. Lehrer would like to put that on the agenda next time as a discussion piece. <br />Vote to establish bond amount for remaining work at 17 Silverleaf Lane in preparation <br />for request to release covenant, potential vote to release subject property from <br />covenant. <br />Mr. Pesce stated several drainage issues were taken care of at Silverleaf Lane in the last <br />couple months. They are installing a new off road swale to a leaching catch basin. A covered <br />up catch basin was found not functioning on the opposite side of the road. The pipe was <br />cleaned out and some pavement repairs were done using binder course. The road looks good <br />at the bottom of the site towards the end that is not part of the subdivision. There were two <br />sets of catch basins there that were cleaned out and functioning. A lot of work has been done <br />and he wanted to see proposed design plans that were provided. There will be loaming and <br />seeding and a final paving. There were several rain storms since the installation and it is <br />working well. He is recommending the Board accept the estimate of $16,000 for loam and <br />seed work and application of 1.5 in. top course. He insists the estimate is adequate, but they <br />should add $1,500 for a final inspection to close out the project. He noted it could be next year <br />after construction of the building. <br />Ms. Waygan calculated the total would be $26,250. She inquired about a surety. <br />Mr. Lehrer does not have documentation, but he would provide the letter and come back to the <br />Board once the bond amount letter is given to the applicant and surety company and amount <br />has been issued or it could be released conditionally. <br />MOTION: <br />Mr. Balzarini made a motion to set the bond amount to $26,250. Seconded by Mr. <br />Richardson. All in favor. <br />MOTION: <br />Mr. Balzarini made a motion to release the bond upon receipt of surety by the town <br />totaling $26,250. Seconded by Mr. Richardson. All in favor. <br />Vote to pay Pesce Engineering invoices for construction inspections. <br />n <br />
The URL can be used to link to this page
Your browser does not support the video tag.