Laserfiche WebLink
Thank you to the citizens, boards, commissions, <br />committees, and departments of the Town of Mashpee <br />as well as AmeriCorps Cape Cod, Barnstable County <br />Cooperative Extension, Friends of Santuit Pond, the <br />Mashpee Environmental Coalition, the Massachusetts <br />Division of Marine Fisheries, the Mashpee <br />Wampanoag Tribe Natural Resources Department, and <br />the University of Massachusetts Dartmouth SMAST <br />for collaboration and support during the year. <br />Respectfully submitted, <br />Richard York <br />DNR Director <br />Report of the <br />Planning & Construction <br />Committee <br />To the Honorable Board of Selectmen and the <br />Citizens of the Town of Mashpee: <br />The Planning & Construction Committee was <br />appointed by the Board of Selectmen in August 2005 <br />to oversee capital improvements to the Town's facili- <br />ties as well as the construction of new buildings. <br />Below is a summary of projects from the past year. <br />Capital Improvement Bond <br />The May 2017 ATM approved a $1.5 bond for <br />completion of capital improvements at various Town <br />buildings and of Town roads. The specific building <br />improvements had been identified through the 6-year <br />Capital Improvement Plan which is updated annually. <br />Over the past year, a number of projects were <br />completed at the three schools. At the KC Coombs <br />School, two furnaces were scheduled for replacement <br />(a third replacement was completed over the holiday <br />break in December 2018). Funding for this project was <br />supplemented by a grant from the MA Department of <br />Energy Resources because of Mashpee's designation <br />as a Green Community as well as utility incentives for <br />improvement in energy efficiency. Also at the KC <br />Coombs School, the window glass for approximately <br />85% of the windows in the classrooms and corridors <br />was replaced with tempered insulated impact -resistant <br />safety glass, in compliance with the energy code. At <br />the Middle/High School, the energy management <br />system was upgraded and the expansion <br />joints/windows were re -caulked. <br />Projects proposed for 2020 which will utilize the <br />last of the bond proceeds are: at the KC Coombs School <br />- upgrade of the fire protection system; and at the DPW <br />— installation of a vehicle exhaust system in the garage. <br />Capital Improvement Plan <br />The May 2019 Annual Town Meeting approved <br />funding for two projects. <br />One project was the development of a Master <br />Plan for the Middle/High School Athletic Field <br />Complex. The scope of work for the project included <br />review of the existing athletic facilities, their use, <br />condition, and maintenance for the purpose of making <br />recommendations to upgrade, reconfigure, reconstruct, <br />and/or replace the facilities as needed to support the <br />use. The Town hired Gale Associates for the project. <br />After review of the needs and consideration of the <br />options, the Planning & Construction Committee <br />recommended the Town move forward with funding <br />for the following improvements: (1) Construction of a <br />new track and synthetic turf field in the stadium; (2) <br />Construction of two multi -purpose synthetic turf fields <br />with one each overlapping baseball and softball fields <br />on the "upper" fields; and (3) Installation of lights on <br />the upper fields. The improvements would address the <br />use conflicts experienced because of the insufficient <br />field space, improve the usability of the fields during <br />poor weather conditions, particularly during the spring <br />season, and allow for better maintenance of the <br />remaining grass fields. Funding for this project will be <br />requested for the May 2021 Annual Town Meeting <br />(estimated around $7-7.5 million). <br />The second project was a Study for a <br />Department of Natural Resources Facility. The scope <br />of work for the project includes completion of a needs <br />analysis for the department, evaluation of potential <br />Town -owned properties for the siting, and development <br />of conceptual plans. During the process, the Town <br />would select a site and prepare a preliminary site plan <br />with cost estimate for presentation to Town Meeting <br />for funding. This project is still ongoing. <br />A third project, approved at the May 2018 Annual <br />Town Meeting was construction of a Storage Garage at <br />the Department of Public Works. The pre-engineered <br />152 <br />