My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-Annual Town Report
>
2022-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2023 5:02:50 PM
Creation date
8/28/2023 11:34:12 AM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Article 10 estate, including but not limited to buildings <br /> To see if the Town will vote to repeal Article XT or other structures, mining, dredging, filling, <br /> (Floodplain Zone Provisions) of the Zoning Bylaw grading, paving, excavation or drilling <br /> in its entirety and replace it with a new Article XI operations), within the A,AE,AH, AO, A99, <br /> (Floodplain Zone Overlay)to read as follows: V and VE Zones as designated on Flood <br /> Insurance Rate Maps dated July 6, 2021, <br /> §174-58 Purpose and Intent and the Flood Insurance Study dated July 6, <br /> 2021, which are on file with the Town Clerk, <br /> The purpose of the Floodplain Zone Overlay is to: Planning Board and Building Inspector, <br /> shall be approved subject to other laws and <br /> 1) Ensure public safety through reducing the bylaws applicable thereto and to the following <br /> threats to life and personal injury provisions.Definitions of terms used herein or <br /> 2) Eliminate new hazards to emergency relevant hereto are set forth in §174-3.1 of this <br /> response officials Bylaw. <br /> 3) Prevent the occurrence of public <br /> emergencies resulting from water quality, §174-60.1 Disclaimer of Liability <br /> contamination,and pollution due to flooding <br /> 4) Avoid the loss of utility services which if The degree of flood protection required by this <br /> damaged by flooding would disrupt or shut bylaw is considered reasonable but does not <br /> down the utility network and impact regions of imply total flood protection. <br /> the community beyond the site of flooding <br /> 5) Eliminate costs associated with the §174-60.2 Severability <br /> response and cleanup of flooding conditions <br /> 6) Reduce damage to public and private If any specific and segregable section, <br /> property resulting from flooding waters provision,or portion of this bylaw is deemed to <br /> be unconstitutional, invalid, or unenforceable <br /> §174-59 Use of FEMA Maps and Supporting by a court, all other sections or provisions of <br /> Studies the bylaw shall remain in full force and effect. <br /> The Floodplain District is herein established as §174-60.3 Designation of community Floodplain <br /> an overlay district. The District includes all Administrator <br /> special flood hazard areas within Mashpee's <br /> designated as Zone A,AE,AH,AO,A99,V,or The Town of Mashpee hereby designates <br /> VE on the Barnstable County Flood Insurance the Building Commissioner to be the official <br /> Rate Map (FIRM) dated July 6, 2021 issued Floodplain Administrator for the Town. <br /> by the Federal Emergency Management <br /> Agency (FEMA) for the administration of the §174-60.4 Requirement to submit new technical <br /> National Flood Insurance Program. The exact data <br /> boundaries of the District shall be defined by <br /> the 1%-chance base flood elevations shown on If the Town acquires data that changes the base <br /> the FIRM and further defined by the Barnstable flood elevation in the FEMA mapped Special <br /> County Flood Insurance Study (FIS) report Flood Hazard Areas, the Town will, within 6 <br /> dated July 6, 2021. The FIRM and FIS report months of such acquisition, notify FEMA of <br /> are incorporated herein by reference and are these changes by submitting the technical or <br /> on file with the Town Clerk, Planning Board, scientific data that supports the change(s). <br /> Building Official, Conservation Commission Such notification shall be submitted to: <br /> and GIS/E911 Coordinator. <br /> FEMA Region I Risk Analysis Branch Chief <br /> §174-60 General provisions 99 High St.,6"'floor,Boston,MA 02110 <br /> And copy of notification to: <br /> Permits for new construction, alteration of Massachusetts NFIP State Coordinator <br /> structures or other development (any man- MA Dept.of Conservation &Recreation <br /> made change to improved or unimproved real 251 Causeway Street,Boston,MA 02114 <br /> 86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.