Laserfiche WebLink
16 Great Neck Road North <br />Nashyee, Nassactiusetts 02649 <br />Mr. Oakley asked if this project is in the refuge. He also inquired if the proponent put any <br />thought into having less new curb cuts and connecting roads that are already existing. <br />Mr. Balzarini stated they already tried that approach and it has not worked out for two years. <br />Mr. Hansen asked about the moving of the stop sign and painting stop lines before entering on <br />Rt. 130. He would like to know how far from the roadway that stop sign will be and if you stop at <br />the sign, by law you then proceed with caution to enter a roadway. If a stop sign is far enough <br />back, it makes it difficult to proceed. He would like a detailed explanation of the stop line and <br />stop sign relative to the roadway. <br />Mr. Dirk answered that generally there are acceptable distances. The general location is 5ft. <br />back from the extension of the curb line. The stop sign and stop line would be set back 5ft. and <br />it allows for proper site line. By placing the sign 5ft. back it allows for proper visibility. The <br />shared use path allows for crossing to happen. If he stops, the front end is not sticking out <br />through the intersection. There will be no cross walk for the project subdivision. <br />Mr. Lehrer stated the proposed width of the road is 24ft. for the project. <br />Mr. Kirrane noted if the Board would like to see those recommendations put on the plan that is <br />not an issue. <br />Ms. Faulkner stated the design plans should be on the plan along with the bicycle racks and <br />parking under transportation demand management. She likes the idea of securing bicycle <br />parking within development sites. <br />Mr. Kirrane stated bike racks can be installed on individual lots, but that may be something for <br />Site Plan Review. They can be shown on a plan but it may be better served later towards <br />developing and Site Plan Review will have it on their radar. Every individual lot would have to <br />go through Design Review and Site Plan Review. <br />Ms. Faulkner would like the certificate of compliance from the Cape Cod Commission regarding <br />the 4 acres of open space deeded to conservation. <br />Mr. Kirrane will relay to his client that the Board will not take a vote unless that is done. <br />Ms. Waygan asked if Mr. Pesce would be available to come to the next meeting. His letter on <br />this is dated March 28th, the only one he gave. She would like confirmation in writing that all <br />these changes are on the plans. <br />