My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/21/2023 PLANNING BOARD Minutes
>
06/21/2023 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 2:38:39 PM
Creation date
9/6/2023 2:42:14 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
06/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
y;MRWx�stapp,� <br />r <br />Lµ � <br />16 Great Neck Road North <br />Mashpee, .%lassachusetts 02649 <br />11, it references the Town Planner or designee to enforce all, and may designate monitoring <br />enforcement agents. Applications will be filed through his office. <br />Ms. Waygan asked if Mr. Lehrer was an enforcement agent, this would allow him to be one, <br />and his job description would need to be updated. <br />Ms. Faulkner is looking for 51% majority vote at Town Meeting. <br />Mr. Lehrer referenced the waiver request on page 5. Initially, when this was drafted it was to <br />empower him to waive requirements during a period of emergency. He reckons the waiver <br />should say in a declaration of emergency, provisions of bylaw are waived by that action. <br />Whomever the appropriate authority is, most likely the County or State can acknowledge an <br />emergency. <br />MOTION: <br />Ms. Waygan made a motion to submit this bylaw to the Select Board for placement on <br />the warrant for October 2023 Town Meeting, after correct language for waivers is <br />added. Seconded by Mr. Balzarini. All in favor. <br />BOARD ENGINEER REPORT <br />Project Review and Inspections <br />Mr. Pesce commented that Ockway Highlands Blue Castle Drive will be paved tomorrow. He <br />has been involved with wrapping up Country Club Estates, they are still continuing with <br />infrastructure work, but water and drainage has been done. They are getting ready to wrap up <br />Sherwin Williams, the grass never grew in and established, so they replanted some areas. He <br />had someone looking at it last week and it was no different than a couple weeks ago, it may <br />be another season before it's completely done. Landscaping and a stone wall was added at <br />Willow Circle, there was concerns about turning radius with a truck as the edge of pavement <br />is close to the edge of the wall. The road was shifted and the landscape island shrunk. He has <br />been assisting the Zoning Board with some items that Mr. Lehrer is aware about. <br />Mr. Balzarini has a good idea of that intersection. Mr. Lehrer stated the Board approved a <br />modified design and it was verbally committed. Challenges were it was never modified under <br />the definitive plan. He is entitled, as approved, but he will need to come back to release those <br />lots. He has the rights to install infrastructure on that road, which he is preparing to come back <br />and say he has done this and release lots. He only released a third of the lots. It was <br />contemplated capturing any security funds necessary to do the intersection. <br />Mr. Pesce was concerned about the safety of the intersection. He acknowledged the safety <br />considerations and agreed to have a better idea, edge of vegetation as you approach from <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.