My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/18/2023 PLANNING BOARD Minutes
>
10/18/2023 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 2:39:57 PM
Creation date
3/19/2024 9:49:35 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
10/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
16 Great Neck RoadNorth <br />wlashyee, _Massachusetts o2649 <br />Mr. Lehrer stated this is a subdivision. The frontages were reduced on Azalea lane. It is within <br />the New Seabury special permit, no frontage issues, conforms with requirements, he <br />recommends endorsement. <br />Ms. Waygan inquired about having to change the subdivision plan. <br />Mr. Healy noted this lot is being divided and then this plan will go to Land Court and the decree <br />plan will change and another one will be issued in the next five years, <br />Tom Bunker clarified the difference is their road is not being changed. <br />MOTION: <br />Mr. Richardson made a motion to endorse the ANR. Seconded by Mr. Balzarini. All in <br />favor. <br />Ms. Waygan signed the mylar. <br />Applicant: Mashpee Commons Limited Partnership/Mashpee Commons II LLC <br />Location: Mashpee Commons (Map 74 Parcels 20 & 20-B) <br />Request: Purpose of the ANR is to evenly trade several small parcels of land. <br />Tom Bunker has two plans, as Mashpee Commons is mostly Land Court registered land, there <br />is a portion of the property that is not, one mylar goes to Land Court. The Land Court plan <br />shows the entire site, and everything being done is on that side. He highlighted everything in <br />green that was being affected by this plan. At the side behind the theatre are two sheds, this is <br />special permit lots 20 and 21, which have a 40b comprehensive permit. These are sheds <br />Mashpee Commons uses for maintenance storage and they want to give that land (4,200 s.f.) <br />out of the comprehensive permit land and put it in the special permit land. The other two <br />parcels, one 1,655 s.f. that is part of the special permit land, is going to the comprehensive <br />permit land, Land Court land and non -Land Court land. Three parcels are created. Land is <br />moved and this plan affects the entire lot of former lot 17, which is becoming lot 26. Lot 20 is <br />becoming 25. Land Court always requires a new lot number. This area is shown on the public <br />plan and 16b is being divided into lots 16e,f,and g. Former Board Engineer Charlie Rowley <br />wrote a letter that stated 16h is not being created until d and f are conveyed from Mashpee <br />Commons LLC to partnership. Until land is in common ownership it cannot be combined. Mr. <br />Rowley instructed him to remove `h'. <br />MOTION: <br />34844i endorse petition. Mr. Richardson. Seconded mr. Balzarini. All in favor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.