Laserfiche WebLink
OF MAS�A�tn <br />IXI. 18i0 <br />FG <br />YdMUW MP <br />16 Great Neck RoadNorth <br />wlashyee, _Massachusetts o2649 <br />Request: Re -endorsement of a Plan previously accepted by the Planning Board as <br />"Approval Not Required". The Land Court has requested that certain <br />information be added to the ANR Plan such as Plan Title change, new lot <br />numbers, reference to the Land Court Plan Number of all abutting lots, <br />showing the opposite side of Red Brook Road, certain dimensional <br />criteria, labels, and updates of the Field Survey Date. Additionally Land <br />Court has requested setting bounds in two locations. <br />Kieran Healy, Land Surveyor with BSC Group, is here tonight for requested Land Court <br />changes. He will need signatures from this Board before submitting to Land court. <br />Ms. Faulkner read through the Land Court requests of information to be added to the ANR <br />plan, a list of 10 items. Ms. Faulkner noted a correction from 1950 to 1949 on number two. She <br />inquired about the whereabouts of abutting lots, they were shown. <br />MOTION: <br />Ms. Waygan made a motion to re -endorse this plan with updates as requested by Land <br />Court. Seconded by Mr. Balzarini. All in favor. <br />Board members signed ANR. <br />NEW BUSINESS <br />Review of Draft Zoning Article intended to Authorize Indoor Recreation Facilities in the <br />1-1 Zoning District and Possible Vote to Submit to the Select Board for Consideration on <br />the May 2024 Town Meeting Warrant. <br />MOTION: <br />Ms. Waygan made a motion to submit to Select Board for consideration on next Town <br />Meeting Warrant. Seconded by Mr. Balzarini. All in favor. <br />Request to Release the Performance Guarantee Securing Construction Completion for <br />the Projects Referred to as The Cottages at New Seabury — Phase iii, OceanFront <br />Subdivision, and also Reduce the Performance Bond for The Cottages at New Seabury — <br />Phase IV <br />Mr. Pesce stated all the work and everything for first two projects are complete. He performed <br />inspections and items addressed were fixed to bring up to code. Recommend all funds <br />requesting released $1,009,620. <br />