Laserfiche WebLink
2 <br />Select Board <br />Minutes <br />March 11, 2024 <br />APPOINTMENTS & HEARINGS <br />DPW Director Catherine Laurent:, Recommendations for Awardofthe Following Contracts: <br />HVAQ Vhgrq&s at_the KC Coombs School: <br />Catherine Laurent, Director of Public Works was in attendance to recommend the Select Board award a <br />contract to Performance Plumbing & Heating, Inc. of Medway, MA in the amount of $1,518,824 for HVAC <br />upgrades to the Kenneth C. Coombs School. The quote includes fees for the required filed sub -bids. <br />Ms. Laurent indicated that this firm was the lowest most responsible bidder for the project. The firm is <br />DCAMM certified receiving a 93% evaluation rating for completed projects. With approval -it is anticipated <br />that work would begin in late June after the school term with project completion in the fall. <br />Motion made by Selectman Sherman to award a contract to Performance Plumbing & Heating, Inc. in <br />the amount of $1,518,824 as recommended. <br />Motion seconded by Selectman O'Hara. <br />VOTE: 5-0. Unanimous. <br />Roll Call Vote: <br />Selectman Cotton, yes Selectman Sherman, yes Selectman O'Hara, yes <br />Selectman Weeden, yes Selectman Wyman -Colombo, yes Opposed, none <br />Owner's Project ManA r,.L „mServiceswfor Mashpee School HVAC Proiects: <br />It is the recommendation of the DPW Director to award a Negotiated Contract Fee for the Owner's Project <br />Manager (OPM) Services for Mashpee School HVAC projects. The fee shall not exceed $285,000. The <br />reimbursement limit is up to $8,000 for use of an online bidding service, and the reimbursement limit of up to <br />$20,000 is limited for an independent estimating firm to prepare a construction estimate. The Town will work <br />on the selection of an engineer/designer, and in moving forward to construction at the two schools. <br />Anser Advisory of Boston, MA is the recommended OPM. Payment would be made on a monthly basis based <br />on actual hours worked for the project team members. The OPM is required by State statute. The proposed <br />project teen is March 18, 2024 through December 31, 2025. <br />It is likely the Town would receive rebates to offset costs. <br />The scope of services does not include a Clerk of the Works. <br />Motion made by Selectman Sherman to award a Negotiated Contract Fee for the Owner's Project <br />Manager (OPM) Services to Anser Advisory for the (2) Mashpee School HVAC projects. <br />Motion seconded by Selectman O'Hara. <br />VOTE: 5-0. Unanimous. <br />Roll Call Vote: <br />Selectman Cotton, yes Selectman Sherman, yes Selectman O'Hara, yes <br />Selectman Weeden, yes Selectman Wyman -Colombo, yes Opposed, none <br />