Laserfiche WebLink
Y� <br /> PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION IS NOT STARTED WITHIN SIX MONTHS OF DATE THE <br /> PERMIT IS ISSUED AS NOTED ABOVE, <br /> MINIMUM OF THREE CALLED INSPECTIONS REQUIRED FORALL CONSTRUCTION MRK I.FOUNDATION OR <br /> FOOTING.2.PRIOR TO COVERING STRUCTURAL MEMBERS.(READY FOR LATH OR FINISH COVERINGS)8. <br /> FINAL INSPECTION BEFORE OCCUPANCY. <br /> APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT POSTED UNTIL FINAL INSPECTION HAS <br /> BEEN MADE.WHERE A CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL NOT BE OCCUPIED <br /> UNTI L FINAL INSPECTION HAS BEEN MADE. <br /> Permit No.: R 22-1452 <br /> Date Issued:12122122 <br /> Fee($): $16MOO <br /> i <br /> I DsvW Mom4s <br /> POST THIS CARD SO IT IS VISIBLE FROM THE STREET <br /> lssp i/dyes uatushpea/pubUoview.php[5/17t=4:17.56 PM <br />