Laserfiche WebLink
pftmgt eyes <br /> WORK SHALL NOT PROCEED UNTIL THE INSPECTOR HAS APPROVED THE VARIOUS STAGES OF <br /> CONSTRUCTION. <br /> PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION IS NOT STARTED WITHIN SIX MONTHS OF DATE THE <br /> PERMIT IS ISSUED AS NOTED ABOVE, <br /> MINIMUM OF THREE CALLED INSPECTIONS REQUIRED FOR ALL CONSTRUCTION WORK 1.FOUNDATION OR <br /> FOOTING,2.PRIOR TO COVERING STRUCTURAL MEMBERS.(READY FOR LAIN OR FINISH COVERINGS)S. <br /> FINAL INSPECTION BEFORE OCCUPANCY. <br /> APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT POND UN71L FINAL INSPECTION HAS <br /> BEEN MADE.WHERE A CERT7FICATI:OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL NOT BE OCCUPIED <br /> UNTIL FINAL INSPECTION HAS BEEN MADE. <br /> Permit No.: <br /> Dab Issued:12122122 <br /> Fe $) $lW5.00 <br /> Off" <br /> ilDavid <br /> POST THIS CARD SO IT IS VISIBLE FROM THE STREET <br /> httpW/pomiiteye&uskmhprJpub w.op[5n7/=4:25:01 PMj <br />