Laserfiche WebLink
PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION IS NOT STARTED WITHIN SIX MONTHS OF DATE THE <br /> PERMIT IS ISSUED AS NOTED ABOVE. <br /> MINIMUM OF THREE CALLED INSPECTIONS REQUIRED FOR ALL CONSTRUCTION WORK;9.FOUNDATION OR <br /> FOOTING,2 PRIOR TO COVERING STRUCTURAL MEMBERS.(READY FOR LATH OR FINISH COVERINGS)3. <br /> FINAL INSPECTION BEFORE OCCUPANCY; <br /> APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT POSTED UNTIL FINAL INSPECTION HAS <br /> BEEN MADE.WHERE A CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL NOT BE OCCUPIED <br /> UNTIL FINAL INSPECTION HAS BEEN MADE. <br /> PemmNo.: R 29-+0126 <br /> Dave Issued:02108121 <br /> FeeM: $272Q 5O <br /> f � <br /> EXIT Da+rkl IlAaaria <br /> POST THIS CARD SO IT IS VISIBLE FROM THE STREET <br /> https publieview4&p[S/l72O23 4:2"6 PM] <br />