Laserfiche WebLink
Patmlteyos <br /> PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION IS NOT STARTED WITHIN SIX MONTHS OF DATE THE <br /> PERMIT IS ISSUED AS NOTED ABOVE. <br /> MINIMUM OF THREE CALLED INSPECTIONS REQUIRED FOR ALL CONSTRUCTION WORK;1.FOUNDATION OR <br /> FOOTING.2.PRIOR TO COVERING STRUCTURAL MEMBERS.(READY FOR LATH OR FINISH COVERINGS)8. <br /> FINAL INSPECTION BEFORE OCCUPANCY. <br /> APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT POSTED UNTIL FINAL INSPECTION HAS <br /> BEEN MADE.WHERE A CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL.NOT BE OCCUPIED <br /> UNTIL FINAL INSPECTION HAS BEEN MADE. <br /> Permit No.: R-20-0278 <br /> Late Issued:03/2&20 <br /> Fee($): $1283 00 <br /> Aj ............. <br /> awles Maiintanis <br /> hags.//pmmiteyee.us/mashpcetpdrtaviaw.phpM7/20M 4:n:47 PA <br />