My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/12/2024 ZONING BOARD OF APPEALS Minutes (2)
>
06/12/2024 ZONING BOARD OF APPEALS Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 10:47:56 AM
Creation date
11/18/2024 3:12:21 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
06/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 12 First Defense®Operation and Maintenance Manual <br /> Table of Contents <br /> 3 FIRST DEFENSE By HYDRO INTERNATIONAL <br /> -INTRODUCTION <br /> -OPERATION <br /> -POLLUTANT CAPTURE AND RETENTION <br /> 4 MODEL SIZES&CONFIGURATIONS <br /> -FIRST DEFENSEO COMPONENTS <br /> 5 MAINTENANCE <br /> -OVERVIEW <br /> -MAINTENANCE EQUIPMENT CONSIDERATIONS <br /> -'DETERMINING YOUR MAINTENANCE SCHEDULE <br /> 6 MAINTENANCE PROCEDURES <br /> -INSPECTION <br /> -FLOATABLES AND SEDIMENT CLEAN OUT <br /> 8 FIRST DEFENSE INSTALLATION LOG <br /> 9 FIRST DEFENSE INSPECTION AND MAINTENANCE LOG <br /> ................. .................................................... ...... ...... .......................... <br /> COPYRIGHT STATEMENT.,The contents of this manual, including the graphics contained herein,are intended for the use of the recipient to whom the <br /> document and all associated information are directed. Hydro International plc owns the copyright of this document,which is supplied in confidence. It <br /> must not be used for any purpose other than that for which it is supplied and must not be reproduced, in whole or in part stored in a retrieval system or <br /> transmitted in any form or by any means without prior permission in writing from Hydro International plc. First Defense'9 is a trademarked hydrodynamic <br /> vortex separation device of Hydro International plc.A patent covering the First Defens&has been granted. <br /> DISCLAIMER: Information and data contained in this manual is exclusively for the purpose of assisting in the operation and maintenance of Hydro <br /> International pIc's First Defense". No warranty is given nor can liability be accepted for use of this information for any other purpose. Hydro International <br /> plc has a policy of continuous product development and reserves the right to amend specifications without notice. <br /> Hydro International (Stormwater), 94 Hutchins Drive, Portland ME 04102 <br /> Tel: (207)756-6200 Fax: (207)756-6212 Web:www.hydro-int.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.