My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/12/2024 ZONING BOARD OF APPEALS Minutes (2)
>
06/12/2024 ZONING BOARD OF APPEALS Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 10:47:56 AM
Creation date
11/18/2024 3:12:21 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
06/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 14 First Defense°Operation and Maintenance Manual <br /> 11. Model SizesI r tf <br /> The First Defense®inlet and internal bypass arrangements are available in several model sizes and configurations.The components <br /> have modified geometries allowing greater design flexibility to accommodate various site constraints. <br /> All First Defense®models include the internal components that are designed to remove and retain total suspended solids (TSS), <br /> gross solids,floatable trash and hydrocarbons(Fig.2). First Defense®model sizes(diameter)are shown in Table 1. <br /> III. Maintenance <br /> First DefenseO Components <br /> 1. Built-In Bypass 4. Floatables Draw-off Port 7. Sediment Storage <br /> 2. Inlet Pipe 5. Outlet Pipe 8. Inlet Grate or Cover <br /> 3. Inlet Chute 6. Floatables Storage <br /> a <br /> '/, <br /> s1� <br /> (not pictured) f <br /> 1 � <br /> a <br /> f <br /> Table 1 <br /> G i�i' ' s/0 9 <br /> Fig. 2 %'; 5/1.s <br /> 6/1.8 <br /> 7/2.1 <br /> 8/2.4 <br /> 1 11 0 11(3.0 <br /> Hydro International(Stormwater), 94 Hutchins Drive, Portland ME 04102 <br /> Tel: (207)756-6200 Fax: (207)756-6212 Web:www.hydro-int.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.