Laserfiche WebLink
PESCE ENGINEERING & ASSOCIATES, INC. <br /> 43 Porter Lane <br /> West Dennis, MA 02670 <br /> Phone: 508-333-7630 <br /> epesce@comcast.net <br /> July 8, 2024 <br /> Mashpee Zoning Board of Appeals <br /> Attn: Ms. Mary Ann Romero, Admin. Secretary <br /> Mashpee Town Hall <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> RE: UPDATED Engineering Review of the Proposed Contractor Yard at 77 Echo Road, <br /> Mashpee, MA <br /> Dear Ms. Romero & Members of the Zoning Board: <br /> Pesce Engineering &Associates, Inc. is pleased to provide you with this updated engineering <br /> review of the Special Permit application for the proposed contractor yard located at 77 Echo <br /> Road, Mashpee, MA. As before we have evaluated the plans for consistency with the Town's <br /> Zoning Bylaw, and conformance with the Massachusetts Stormwater Management Regulations. <br /> We have reviewed the following new information to prepare this letter report: <br /> • Revised Proposed Site Development Plan, entitled "Site Plan Proposed Contractor's <br /> Yard" at 77 Echo Road, Mashpee, Massachusetts," prepared by Cape& Islands <br /> Engineering, 1 sheet, dated April 23, 2024, and revised July 2, 2024. <br /> • Revised Stormwater HydroCAD Calculations, dated July 2, 2024, and a revised <br /> Operation & Maintenance Plan, prepared by Cape & Islands Engineering, revised July 2, <br /> 2024. <br /> • Letter to the Mashpee Plan Review Committee from Cape & Islands Engineering, "RE: <br /> Response to— Engineering Review of the Proposed Contractor Yard at 77 Echo Road, <br /> Mashpee, MA, Dated June 9, 2024, by Pesce Engineering &Associates, Inc.,"dated <br /> June 11, 2024. <br /> The applicant's engineer has made several changes and adjustments to the design in response <br /> to our previous comments. This latest design plan shows a bituminous concrete pad for the <br /> parking of the heavy equipment and trucks to be used on site, along with a new stormwater <br /> collection and treatment system (new First Defense Hydro International treatment unit)for this <br /> pad area. <br /> Along with the above-described design change, the current set of plans and drainage <br /> calculations have satisfactorilv addressed virtually all of our rgvious en ineenn review <br /> comments. <br /> However, at the discretion of the Zoning Board, we would still recommend that an on-site <br /> emergency spill kit be provided for this parking pad/area (located in the northwest or northeast <br />