Laserfiche WebLink
Select Board <br />Minutes <br />October 7', 2024. <br />APPOINTMENTS & HEARINGS <br />13PW Director Cauttmeni ne Lauu:are nt: <br />D-is qals5ion arn St�raval of Award ark of (,'cmm�tract f'br Salto <br />Motion made by Selectman ymmm urm-C:amlmmmmmbo to award rd am contract to Eastern finer ts, Inc. for regional <br />road dt in the aurmmammmmmt of S60.45 per ton. <br />Motion seconded y Selectinan Cotton. <br />VOTE: 4-0. Unanimous. <br />.amll Call Vote: <br />Selectman Sherman, yes l tmmman 'eed mm, yes Selectman Wyman -Colombo, yes <br />Selectman ;m)tton, yes Opposed, none <br />Discussion and Ar uuaKtt..pf..Award cnCContract for Aap uuto auk... By -Product: <br />uct, <br />Motion made by Select mmiiim ymmma n-C olommmbo to award am contract to Morton Salt for regional pre -mixed <br />treated salt in the amount of $80.73 per ton. <br />Motion seconded y Selectman Cotton. <br />VOTE: 4-0. Unanimous. <br />li tt Vote: <br />Selectman Sherman, yes <br />Selectman Cotton, yes <br />pplIu aul .fir- Product:, <br />Selectman Weeden, yes Selectman Wyman -Colombo, olomucmbo, yes <br />Opposed, none <br />Motion made by Selectman ym mm .-C oloiirmmbo to award mm contract to G.B. Soins Construction Comm, Inc., <br />for yaim;mmltmmrmmt BY -Product in the amount of $2.45 per gallon. <br />Motion. seconded by Selectman Cotton. <br />VOTE: 4-0. Unanimous. <br />to 11 CallVote: <br />Selectman Sherman, yes <br />Selectman n Cotton, yes <br />Opposed, none <br />l ctmmm mm Weeden, yes Selectman Wyman -Colombo, bans yes <br />, ; tirµ c asnscorri �sing Private oars: DPW Director Catherine <br />L u�mreirt and Wastewater <br />Ibe Select Board reviewed d the e r Ex anrnsicnnn Project Phase 2 under current design with Cad- wrirne t,auaure nt, <br />L.Nr c:tamr of Public Works and R-, rc d Meader, Wastewater Superintendent. 'Fhere are several. 1. rivamte <br />nmds/neighborhoods within the expan.sia:arr, and it is prudent to address tf.te adverse rse impacts of stormwater r runoff <br />The immediate ediat incentive fi:ar the Select ward's consideration. is au road conversion that should be considered in an <br />overall ll policy for all fluture phases of sewer onstru;uc;t o n. <br />savings w Guld be realized any coordinating storrrnw anter infrastructure improvements with. the reconstruction of"the <br />roads a ftt�x the installation ofthe sewer mains. A combined project would address the largest potential contributors <br />to poor water r uua lity, The Select Board. uu.rnd r'rowmn Bylaw has the authority to initiate private to public road <br />co nvrsmamrus. <br />