My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/01/2016 ZONING BOARD OF APPEALS Minutes
>
07/01/2016 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2025 5:05:06 PM
Creation date
2/13/2025 1:28:41 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
07/01/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> AUGUST 24,2016 <br /> Chairman Furbush said that there are only four Board members and told Mr. Brooks that <br /> if he decided to continue with the hearing, that all four members would have to vote <br /> positive in order for the application to pass. He suggested that the hearing be continued <br /> until September 28, 2016. <br /> Mr. Bonvie made a motion to accept the continuance until September 28,2016. Mr. Gould <br /> seconded. All were in favor to accept the continuance. <br /> OTHER BUSINESS <br /> Mashpee Commons: To discuss the project construction progress as stated in the <br /> Comprehensive Permit, Section IV. Decision and Conditions, sub-section 8.j <br /> Board Member, Ron Bonvie stepped down from this discussion. <br /> Mr. Feronti approached the Board and said under the Comprehensive Permit, Mashpee <br /> Commons is required to give an update of the construction progress. The construction on <br /> the buildings started in March. They received their final approval from Mass Housing in <br /> January, and pulled their first permit in March. <br /> He said there are currently three (3) buildings under construction. He pointed out on the <br /> approved site plan that there are eight(8)buildings that make up Phase 1 A of the residential <br /> expansion. In those eight buildings, 14,000 sq. ft. of commercial space, 52 units, and 13 <br /> are affordable within those 52 units. The units are spread amongst the eight buildings as <br /> are the affordable units. <br /> There are currently three buildings under construction; building 40, 41, and 42. Building <br /> 40 is a modular building, and was the first foundation that was poured in 2014 to preserve <br /> the permit. There are eight units in that building. The modular boxes were delivered and <br /> the plan is to secure the boxes next week. These boxes are ready to be set on Wednesday, <br /> August 31. There are ten (10) boxes plus a roof, so over the span of two to three days,that <br /> building will be set. There is a lot of interior work required due to the design, and all the <br /> kitchens have to be installed after the fact because they were on bare walls. The goal for <br /> completion is December 1 st. Out of the eight units,two are affordable. <br /> Building 41 was the first building that was initially started. This building is a"stick-built" <br /> building, and the target for completion is mid-October with occupancy November 1" <br /> There are eight, one bedroom units in this building and four commercial spaces on the <br /> ground floor. Out of the eight units, two of them are affordable units. This is a traditional <br /> construction project,the siding and drywall are done,and the kitchen should be done within <br /> the next week. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.