Laserfiche WebLink
Toirn of NJ hpee . <br /> as <br /> 16 G1 I A';i Iioad�_�vr�l� <br /> l�xslz�r ,. � et,esacl�usctts U?(349 <br /> MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES f <br /> SEPTEMBER 14,2016 <br /> The Mashpee Zoning Board of Appeals held Public Hearings on Wednesday, September <br /> 14, 2016, at 6:00 p.m. in the Waquoit Room at the Mashpee Town Hall, 16 Great Neck <br /> Road North. Chairman, Jonathan D. Furbush, Board Members William A. Blaisdell, <br /> Ronald Bonvie, Dom DeBarros, Scott Goldstein, and Associate Members, Brad Pittsiey <br /> and Norman J. Gould were present. Building Commissioner, Michael Mendoza was also <br /> present. <br /> PLEDGE OF ALLEGIANCE <br /> The meeting was not televised as originally scheduled. <br /> CONTINUED HEARINGS <br /> 67 Monahansett Road: Owners, Jeanne M. Gallagher and Regina L. Lawson request a <br /> Written Finding under §174-17 of the Zoning Bylaws to raze and replace a single-family <br /> dwelling on property located in an R-3 Zoning District and within the Popponesset Overlay <br /> District, (Map 123 Parcel 97), Mashpee, MA. (Continued_from July 13, 2016 Bearings at <br /> the request of the Representative). <br /> Mr.Peter Lavoie, Civil Engineer with Guerriere&Halnon,Inc.,Milford,MA representing <br /> the modular home project. Also present was Karen Orlandi, and Cary Orlandi, Associates <br /> with Millbrook Modular Homes. Mr. Lavoie provided a site development plan depicting <br /> the existing house and a portion of the proposed foundation. The lot is 11,000 sq. ft. and <br /> slopes in the along the existing tree line in the rear with a stone wall. The existing house is <br /> 800 sq. ft. with an "L"-shaped deck and outdoor shower. The existing septic system is <br /> located in the back with a dry well and cesspool. <br /> The project consists of razing the existing house, with the foundation to remain, and <br /> expanding the foundation 5 ft. in the rear. The footprint will be increasing from 800 sq. ft. <br /> to 900 sq. ft. The wrap-around deck will remain and there will be a screened porch added. <br /> The septic system will be upgraded to Title V requirements, and the driveway will remain <br /> in the same area. The shrubs will be replaced after the work is completed. The red line on <br /> the plan depicted the erosion control, and will be presented to the Conservation <br /> Commission on September 22, 2016 as a determination. <br /> Mr. Goldstein read the Conservation Department comments dated August 23, 2016 into <br /> the record basically stating that the "ZBA can move forward with their review". <br /> Chairman Furbush read Glen Harrington comments for the Board of Health dated <br /> September 13,2016 into the record;"stating that the Title V plans were not yet approved". <br /> He also would like the pocket door removed to meet the 6 ft. opening requirement. <br /> 1 <br />