My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/01/2016 ZONING BOARD OF APPEALS Minutes
>
07/01/2016 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2025 5:05:06 PM
Creation date
2/13/2025 1:28:41 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
07/01/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> SEPTEMBER 14, 2016 <br /> Chairman Furbush announced that Board Member Scott Goldstein was stepping down <br /> from this hearing. Associate Member,Brad Pittsley will be sitting in with the regular Board <br /> Members. <br /> Ms. Pat Sciuto,from Harbor Homes Building represented the homeowners for this project. <br /> Ms. Sciuto said the project consists of removing the existing deck with a sun room and <br /> meets the existing setbacks at 15.9 and was at 15.5 and will only increase by .4. The new <br /> structure will be on sono tubes and will include six sliders with 2' x 6 construction, and <br /> will not be heated. <br /> Chairman Furbush read the Inspection Department comments into the record. He also read <br /> the Board of Health comments into the record. The Board had concerns with the location <br /> of the septic, and the plot plan showing the blue stone patio. The decking will be replaced. <br /> There will be no step-down from the sunroom to the deck. He also read the Conservation <br /> comments into the record. <br /> Mr. Bonvie made a motion to approve the Written Finding with the following conditions; <br /> The Board determined the project meets all conditions of a Written Finding under Mass <br /> General Law 40A Section 6. Also conditioned on the following; <br /> The site plan needs to have a revision date, also depicting that the new blue stone patio <br /> language was removed and replaced with whatever decking will be installed.The new entry <br /> with the 3.5' covered entry was removed. One revision date with two revisions stated. <br /> Site Plan: Prepared for SEJO Corporation of 142 Fells Pond Road, Mashpee, MA. J.E. <br /> Landers-Cauley,P.E.,Civil Environmental Engineering,PO Box 364 West Falmouth, MA <br /> 02574,ASS.-4122-198,Date: 4/23/15,Scale: 1"= 10',Drawn by:JDR,Job No.2517,Sheet <br /> 1 of 1, Signed by John Landers Cauley, Registered Professional Engineer. (To be revised <br /> as discussed), <br /> Floor Plans: New Addition/Remodeling For: Cohen Residence, 142 Fells Pond Rd., <br /> Mashpee,MA. By: Cotuit Bay Design, LLC, 43 Brewster Rd.,Mashpee,MA. Scale: '/4"= <br /> 1'0", Dated: 3/10/2016, Drawing No. Al, First Floor Plan, Drawing No: A2, Front <br /> Elevation, Rear Elevation, Left Elevation, Right Elevation. Drawing No: A3, Building <br /> Section @ Entry,Framing/Footing Plan, Roof Framing Plan, and Foot Plan. <br /> Conditioned upon a letter/email from the Board of Health that the septic tank must remain <br /> accessible and there will never be any heat,and in perpetuity as noted by this Zoning Board <br /> or Building Inspector. <br /> Mr. Blaisdell seconded. All were in favor of the sun room addition. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.