Laserfiche WebLink
MEETING MINUTES <br /> JANUARY 8, 2025 <br /> MASHPEE ZONING BOARD OF APPEALS <br /> Mr. Ganzenmuller read that the Conservation meeting is being heard on January <br /> 9, 2025. He read the Board of Health comments into the record; "3 bedroom <br /> house, I on the first floor and 2 on the second floor. No door on second floor office. <br /> Septic designed for 3 bedroom." <br /> Mr. Furbush visited the site and mentioned that the road is situated in <br /> circumference around this property, and asked if the water runoff will be affect the <br /> lot if filled to bring the lot up higher. <br /> Attorney Wall said that there is no fill proposed, and there is minor grading <br /> proposed, and the house will be situated away from the pond. <br /> Mr. Borselli stated that the land as it exists today is the lowest part of this <br /> neighborhood, and currently water flows over this property, and into the pond. There <br /> are minor amounts of fill proposed, and the lot will be graded 12-18 inches, and <br /> there will be lawn area surfaced with a swale installed onto the property so the <br /> surface water will be collected onto the property, he cannot speak for the other <br /> houses in this neighborhood. The drainage criteria is for a 25-year event on the that <br /> the water is collected on this property. <br /> Mr. Goldstein asked if the septic system will be filled. Mr. Borselli said that yes, it is <br /> a vaulted denite septic system, and was approved by the Board of Health. <br /> Mr. Bonvie wants to make sure that all the water is collected on this site. He wants <br /> the criteria submitted along with the drainage calculations, either by rational <br /> method, DEP or NOA standards, and approval by the Conservation Department. <br /> Mr. Borselli explained to the Board that he will create a shallow grass lined recharge <br /> area. The runoff from the roof and surfaces will have a berm, and will be graded to <br /> prevent any water flowing onto the street, and prevent any other water runoff from <br /> other properties flowing toward this lot. <br /> Mr. Morris mentioned that he is anxious to get this project approved. He would prefer <br /> this hearing be approved and conditioned upon Conservation approval. The Board <br /> disagrees, and would rather see the drainage calculations presented at the next <br /> hearing. <br /> The Board asked Mr. Borselli if Concom generally asks for drainage calculations. He <br /> said that the application hasn't been heard yet. <br /> Mr. Bonvie asked Attorney Wall for a date to extend. He asked for a continuance <br /> until February 12, 2025 hearings. Mr. Furbush made a motion to extend the hearing <br /> until February 12, 2025. Ms. Sangeleer second. All were in favor. <br /> 13 <br />