My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/24/2024 ZONING BOARD OF APPEALS Decision
>
07/24/2024 ZONING BOARD OF APPEALS Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 5:03:14 PM
Creation date
2/20/2025 2:00:51 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Decision
Meeting Date
07/24/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
to — <br /> Please complete the table below (Lot area andstructure coverage should be shown below in sluare feet <br /> Criteria Existing (if a� jjcabie , rvn m m _ Proposed <br /> Lot Area..(uland.�.. ....,, ............._._. _ 6,819 6,819_.,_._ww._w..m_�� <br /> Lot Area wetlands 11,867 11,867 _w <br /> ..x _..........................._.... ................. <br /> www ,....._... _..... _. <br /> Lot Area(total) 18,686 18,686 <br /> Fronta a 85.07' 85.OT �__._._..........._..... w. <br /> Structure Coverage* 2,647 2,737 <br /> L.Jtot Coverage** 38.8%(including SPA) 40.1%(including swim/spa) <br /> Building Hei t 6 , ,_.....__w.........�www_ 2 6 ;_ ._ ...w <br /> g._._ ....__�._ .,.,.,.,.,..wwwwwwwww. ...�. ......w_._.._w <br /> Side Yard Setbacks 5.1 -Spa 2.0 <br /> �. ..� 7.9'&35.1' -Spa 3.6' 7.9'&3 ' ' <br /> ........ ....__. ._w.�..,n..._._..�., ........._�,.,..__.....www__..,__www.......wwww_.__._wwwww . w_...�.._ <br /> Front Yard Setback 29.9' 29.9' <br /> Rear Yard Setback _ 23.4'to mhw T to TC Bank 23.4'to MHW 4.3'to TC Bank <br /> Setback to Water and Wetlands 3'(Existing deck) 3'(existing deck)_w _ww.._....w......... <br /> *For structure coverage please show the aggregate total of existing and proposed structures on the site in <br /> square feet including but not limited to houses,barns, sheds, garages,pools, carport,pergolas, etc. <br /> **Lot coverage shall be calculated utilizing the Structure coverage as the numerator and lot area exclusive <br /> of water and wetlands as defined in MGL Ch. 131 Sec 40 as the denominator. Land Subject to Coastal <br /> Storm Flowage is a wetland for the purposes of calculating lot coverage. <br /> Lot Coverage= Structure Coverage/Lot Area <br /> Accompanying Application Narrative: The application and plans must be accompanied by a written <br /> narrative prepared and stamped by a qualified registered design professional that describes the site's existing <br /> conditions. Further,the letter should include a description of the alterations proposed in the application and <br /> identify how the proposed-continuance, extension, and/or alteration of any pre-existing nonconformities <br /> will not be substantially more detrimental to the neighborhood than existed previously.The narrative should <br /> describe the storm water management and drainage provided on the site and how it comports with the <br /> requirements of the Mashpee Zoning bylaws. Further, the narrative should attest to the accuracy of the <br /> information provided in the application including on the submitted plans, application form, and within the <br /> accompanying narrative. <br /> Signature of Owner or Authorized Representative (Attach,written authorization signed by property owner <br /> if applicable): , :'' <br /> „s <br /> KieranJ. Healy, PLS 1, <br /> w _ _._...d/4 ..... :. <br /> Mail certified copy of Decision to: BSC Group Inc <br /> 349 Route 28, West Yarmouth, MA 02673 <br /> �_ ..Scheduled Date TOWN CLERK <br /> � °�,J °� ��..� <br /> � - DATE STAMP <br /> Rev.0210212024 <br /> lu4 i�f, i .Lr1U y im{r Y„Y�� wo. <br />
The URL can be used to link to this page
Your browser does not support the video tag.