Laserfiche WebLink
I ro LE N <br /> Please complete the table below (Lot area and structure coverageshould be sly, i below in uare feet': <br /> Criteria _. Existin�(if .py icable}.....__mm..._. M.._._..........W.. ��ro . <br /> Lot Aream( landm. „_ <br /> ..........._._. .. m_ __.ww__... _.. <br /> Lot Area wetlands 7,125 sq. ft. (LSCSF) 7,125 sq. ft. (LSCSF) <br /> Lot Area(total) 6,000 sq._ft.__w w w___ _..w.... 0 srl....ft. ..... ..__w .... 0 so. ft. <br /> Fronta �e 60' �75, ..._..� .m......m.m..�..........._. 75' <br /> �.._.... _w....._ .. _ _............ <br /> Structure Cover e* _ wwwww ww 1,482gs . ft. 1,769 sq. <br /> ft. <br /> ....ww_w....ww......__ _... _... .. ...... <br /> Lot Coverae** 25% __.. 100°l0..._ _.. 100%__.w ww <br /> .. .. w.___..... __....._ <br /> Buildin Hei ht 30' > 30' <br /> Side Yard Setback(s) 15 15.1ww(NE},�13.4SW) _ _ 15.5 (N_Ei 94.6' SW� w M <br /> Front Yard Setback 25' 25.6' 25.3' <br /> _.v ._ ......v.... ._ . . <br /> _ .w... -uw._,,,,,,,,,,,, _. .._ _..... <br /> Rear Yard Setback 15' 26.2' 25' <br /> wwwwwwww.._.._.._._....��_..�..��w�w�w�w�w..�._. _..... ...ww.......ww..._ .�aa__-______�._....__ ........ ..........._.__..www;...�..�.. <br /> Setback to Water and Wetlands 0 0 <br /> *For structure coverage please show the aggregate total of existing and proposed structures on the site in <br /> square feet including but not limited to houses, barns, sheds, garages,pools, carport,pergolas, etc. <br /> **Lot coverage shall be calculated utilizing the Structure coverage as the numerator and lot area exclusive <br /> of water and wetlands as defined in MGL Ch. 131 Sec 40 as the denominator. Land Subject to Coastal <br /> Storm Flowage is a wetland for the purposes of calculating lot coverage. <br /> Lot Coverage=Structure Coverage/Lot Area <br /> Accompanying Application Narrative: The application and plans must be accompanied by a written <br /> narrative prepared and stamped by a qualified registered design professional that describes the site's existing <br /> conditions. Further,the letter should include a description of the alterations proposed in the application and <br /> identify how the proposed continuance, extension, and/or alteration of any pre-existing nonconformities <br /> will not be substantially more detrimental to the neighborhood than existed previously.The narrative should <br /> describe the storm water management and drainage provided on the site and how it comports with the <br /> requirements of the Mashpee Zoning bylaws. Further, the narrative should attest to the accuracy of the <br /> information provided in the application including on the submitted plans, application form, and within the <br /> accompanying narrative. <br /> 7 <br /> Signaturew ���' . r �ntative (Attach written authorization signed by property owner <br /> if applicable); ,�eo r�th � ed Re..�. <br /> �„ ...........� <br /> Mail certified,,c",py of Decision to: Christo her J. Kirrane, Esq., PO Box 560, Marsh pee, MA 02649 <br /> Scheduled Date '1 '", E f ( a, <br /> TOWN CLERK <br /> DATE STAMP <br /> y � <br /> ,..mi <br /> �E✓�r-'- <br /> aE Rev.0210212024 <br />