Laserfiche WebLink
Rosewood towards right side of away from homes and <br /> bulkhead bulkhead and have <br /> o eroded area siding clearance <br /> appears to indicate - design and install <br /> water flow towards drywell <br /> house * annually <br /> a mulch 1-2" from inspect/treat for <br /> bottom of siding termite and water <br /> damage <br /> 0 Minimally mulch <br /> area where siding is <br /> <6" above grade <br /> 37 Yes Yes a grade appears to e re-grade to pitch <br /> Rosewood pitch towards away from homes <br /> building. and have siding <br /> a mulch also noted as clearance <br /> touching siding * annually <br /> inspect/treat for <br /> termite and water <br /> damage <br /> 0 Minimally mulch <br /> area where siding is <br /> <6" above grade <br /> 39 Yes Yes a patio appears to e remove pavers, pitch <br /> Rosewood slope towards patio away from <br /> building house and also <br /> a mulch 3-5" below ensure siding not in <br /> bottom of siding contact with pavers, <br /> a Siding touching re-install pavers <br /> patio pavers e re-grade to pitch <br /> away from homes <br /> and have siding <br /> clearance <br /> * annually <br /> inspect/treat for <br /> termite and water <br /> damage <br /> 0 Minimally mulch <br /> area where siding is <br /> <6" above grade <br /> 47 Yes Yes a mulch touching e re-grade to pitch <br /> Rosewood bottom of siding away from homes <br /> and have siding <br /> D(J[,')X.A <br /> The Cottages Phase 111 16 <br /> Mashpee, MA <br /> ,A,,EN 6 I <br />