My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/03/1988 PLANNING BOARD Minutes
>
02/03/1988 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:55:20 PM
Creation date
3/6/2025 12:57:17 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
02/03/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br /> Vichael Pcwers prosented the Hydxcicgical re,,ort, <br /> There are tw(-.,1 reasrns fcr iihe Propcsall "'jx-site, <br /> First, there is some coisideratirn that in time there <br /> mAy be a rPgZ'.or,,aI plant built. <br /> 3eeonei , it wculd be practical. <br /> - Discussicn, on the impact on Zone 2. <br /> - Tcny Ferraganc ',':Iequested a breakd(-,Am cf what he is explaining <br /> to 3h--,,q the methcdoicTj and an analysis, <br /> Cr=f:ents frcm the 'Public <br /> Charles satin (Engineer) wculd liIKO tc, see the e8tir-Ated cc=pesition <br /> of the discharge; also, wou1,1 like to see the scdi-= increase estimate. <br /> Tcm Carver (Cctuit) had twc questic.ns. <br /> How do they decide the shape of the gravel outside the dotted lime. <br /> Mr. Powers explained they acmpare the Spring and other seasons and <br /> they use a math equasion. <br /> Two other people Iccked at it and came up with the same shape. <br /> Michael Llcyd asked if it was definite that that- this Treatment <br /> Plant will be built. <br /> - Nc. They are als(-J studying the po-asibility of b=-Iding a sub- <br /> regional treatment plant wilich *,.4-',-ll taxa in this proJect and <br /> three others. <br /> I- Tnis Regi,:-ial Plant has been discussed f,-Ir a Ilear with the Tcwn. <br /> This is the reascm for Phase I., Hc--.wever, if this -is nCt propcsed <br /> they will be bui"ding this Treatment, Plant after ?hase I. They <br /> have praised 62 .mita for Phase 1. <br /> - (LAwyer) CO-twit Fire Commission - Harlan Dolinear <br /> - What would be the final figure if the project was 3onnected to <br /> the regional faciliti. <br /> - It would be lbet*•sen 3.�4 and '7,6 <br /> - Public questic.,Ied the location ,,,,f the leaching area. <br /> - The .Mate had approved the location and they have done a <br /> geOlcgical stud � <br /> - Public questioned what the ocst the Treatment Plant is and hew <br /> much it otould acst to run it. <br /> - E ve z- <br /> ything is submitted az-.,d approved by DEQ�. <br /> - The arrived operating cost is generally taken <br />
The URL can be used to link to this page
Your browser does not support the video tag.