Laserfiche WebLink
Basically what is going to ha <br /> open is there is going to be two wells and <br /> the capacity will be 600 galicris per minute. Thr vgTh the Piping system this <br /> flow will service the need& tkiat are requitred by the Fire Department, Paul <br /> Lanza stated that, their Prrposal vrith a swj-mu,n- ly"I m wold be f( use <br /> d <br /> tr 8, V'ste water treatment plant, T110 waste water trc-atmezit Plant has received <br /> approval fro-i D-rQi;,, It is a 26,00C gallon a da�7 plat ana the affluent from <br /> the plant would to dispensed int(,"- the ground water through a leaching system., <br /> The quality of the affluent far exceeds what would be reasonbly accepted <br /> frow. septic SYStLm3,, The state: requtrraas rep(-,;rts (),,-I this. The quality of" <br /> the waste water treatment is pr(-'ducpd through a bicicgiral aystem that <br /> Lnvolves a settling prc',,cesa and involvps a bi,,-Jcgioaj Pr,-�CqSs, T%e type of <br /> facility that is being Propnsed here prr�bably produoes as high a quality <br /> affluent, <br /> Tcm 11"adala asked if they cculd be m�-re specific on the quality of water. <br /> The nitrogen level Tqnuld be about 15 Milligrams per liter. They do I have an <br /> updated geologic,al report which they are going tc give the &.,,ard. <br /> There is one additicn to the plan in a oertain area in which they will be <br /> providing access easement to Mr. Jcrap Wilo is an abutter. It ties intn <br /> another subdivision that exists. <br /> Tony Ferragamo Stated,, that he would like to discuss the dirt road that goes <br /> froxn the east to the west. <br /> Kevin Kirrane stated that the one thing these lots woj1j& not include would <br /> be the acerage that consists of the roadway. Within the TCWrL Of llashpee there <br /> is a total acreage of broken d(:wn upland and wetland and for the purposes of <br /> establishing the density of" the 2 unit per acre t1iey have eliminated the <br /> cranberry bog f=Ction of the open Space which is 15.,8 acres. 54--1 acres is <br /> upland and 1,0 acres of wetland. Tony stated that they are proposing that <br /> 90% of the wtland is thrown out so they really have .1 acres of ,wetland. <br /> Kevin Kirrane stated that for purposes of density calculations they remove <br /> the bogs for this calculation because they believe the bogs aae under <br /> separate ownership. The bogs were not included as a lot. -Mr. Kirrane <br /> requested that the Board deduct the bogs from tha calculation. <br /> Tony asked about the traveled way, The traveled way &'es exist. It is a <br /> part of a network of ancient ways or 1raintenance roads fcr purposes (,f <br /> access tea the Site. Marie pointed out that there was a path around the pond. <br /> The Board stated that it should be on the condition that there is a public <br /> way along the PatA. <br />