My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/26/1998 BOARD OF HEALTH Minutes
>
02/26/1998 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 5:02:15 PM
Creation date
3/6/2025 2:18:38 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
02/26/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES February 26, 1998 7 BOARD OF HEALTH <br /> LF4 Update <br /> Mr. McQuaid stated, "After our meeting in Lakeville it was suggested by the <br /> D.E.P. to make one more site visit." "We met on site this past Tuesday, originally, it was <br /> determined that it would take three days to clean up the site and the town would have to <br /> pay for an excavator for three days however, we now determined that it would going to <br /> take two to three weeks." "The memo from the Selectmen asks us to certify that the <br /> original $2,085.00 is the maximum the town is committed to in this cleanup process." <br /> "Well, it isn't that." "I wrote a lengthy response to Mr. Whritenour on this subject stating <br /> that unknowns cannot be predicted." "Mr. Whritenour was unhappy with that." "He <br /> would like Weston and Sampson to come down and estimate the cubic yards of debris and <br /> then estimate what percentage of that is construction and demolition that Mr. DiMaggio <br /> can rightfully charge the town for a front-end loader just to landfill the stuff." 'My memo <br /> stated emphatically, that there is no way I can make an estimate." "I spoke with Roger <br /> Alcott who is coming down Monday and will provide an accurate estimate as to the total <br /> amount of cubic yardage of debris there." "We will then have to decide what percentage <br /> of construction and demolition is there." <br /> Mr. Ball stated, "I would recommend the agent research the equipment costs for <br /> the site and transfer station." "I believe Mr. DiMaggio quoted a fee of$65.00 per hour." <br /> *****NEW BUSINESS***** <br /> Request -Po Lay Rides - Annual W@m anoa Pow-Wow <br /> A4r. Evans relayed, "The Tribal Council is requesting the Board approve pogy <br /> rwal Pow-Wow." <br /> Mr. Doherty motioned to approve the request for pony rides at the 1998 Annual <br /> Wampanoag Pow-Wow with the stipulation manure is removed promptly, Mr. Cram <br /> seconded, all ag-eed. <br /> Variance request - 15 Dean's Hollow Road <br /> Mr. lVcQua}d relayed, "The applicant is requesting a 10' variance from the <br /> leaching facility to the foxindation, a 7.5' sideline variance from the:leaching facility to the <br /> street, a 5' sideline variance from the septic tank to the street and a 1' variance from the <br /> bottom of the leaching facility to groundwater," <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.