Laserfiche WebLink
 Proposed raze and replace of single-family dwellings. <br /> Objective: to address concerns raised in the previous meeting and present modifications <br />to the original plan <br />Response to Concerns Raised: <br /> Mass Division Fisheries of Wildlife Approval <br />o Status: Approval received. <br />o Impact: The proposal does not adversely affect the resource area and meets <br />performance standards for state-listed species. <br />o Documentation: A letter is attached to the submitted documents. <br /> Potential Tree Damage <br />o Assessment: Bartlett Tree Services evaluated the project. <br />o Conclusion: No expected damage to on-site or adjacent property trees from <br />demolition and construction <br />o Documentation: Supporting letter attached. <br /> Embankment Stability <br />o Assessment: Conducted by ING House, a professional and structural engineering <br />firm <br />o Conclusion: The embankment is suitable for demolition and construction; <br />the proposal improves property stability. <br />o Additional Assessment: Marsh Matters Environmental confirmed no impairment <br />to the physical stability of bank segments. <br /> Impact on Wildlife <br />o Assessment: Marsh Matters Environmental determined no impairment to breeding <br />habitat, escape cover, or food sources for wildlife. <br />o Revegetation Plans: High wildlife-value vegetation will be revegetated. <br />o Documentation: Supporting letter attached <br />Plan Modifications in Response to Committee Requests <br /> Deck Setback Adjustment: <br />o Change: Deck moved further from the lake; setback adjusted from 21.7 ft to 21.5 <br />ft. <br /> Lawn Cover Planting: <br />o Addition: Increased areas of lawn cover planting near the retaining wall to the <br />south of the property. <br /> Footing Changes: <br />o Modification: Use of different footings instead of diamond piles as recommended <br />by the committee. <br /> Stormwater Runoff Mitigation: <br />o Implementation: Crushed stone placed beneath the lower deck to inhibit runoff. <br /> Protection of Septic Tank and Leaching Field: <br />10 <br /> <br /> <br />